Murti, Dhimas Wisnu Murti (2021) Sistem Produksi dan Optimasi Layout Produksi Batu Tahan Api Dengan Metode Line Balancing di PT. Loka Refractories Wira Jatim. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur.
|
Text (Cover)
17032010025.-cover.pdf Download (573kB) | Preview |
|
|
Text (Bab 1)
17032010025.-bab1.pdf Download (237kB) | Preview |
|
|
Text (Bab 2)
17032010025.-bab2.pdf Download (242kB) | Preview |
|
Text (Bab 3)
17032010025.-bab3.pdf Restricted to Registered users only until 2024. Download (916kB) | Request a copy |
||
Text (Bab 4)
17032010025.-bab4.pdf Restricted to Registered users only until 2024. Download (807kB) | Request a copy |
||
Text (Bab 5)
17032010025.-bab5.pdf Restricted to Registered users only until 2024. Download (251kB) | Request a copy |
||
|
Text (Bab 6)
17032010025.-bab6.pdf Download (229kB) | Preview |
|
|
Text (Daftar pustaka)
17032010025.-daftarpustaka.pdf Download (460kB) | Preview |
|
Text (Lampiran)
17032010025.-lampiran.pdf Restricted to Registered users only until 2024. Download (584kB) | Request a copy |
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Unnamed user with email 17032010025@student.upnjatim.ac.id | ||||||||
Date Deposited: | 28 Jul 2022 01:56 | ||||||||
Last Modified: | 28 Jul 2022 01:56 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/8048 |
Actions (login required)
View Item |