Sande, Nabila Aqiila SISTEM PRODUKSI DAN PENGGUNAAN METODE JAM HENTI UNTUK MENGHITUNG WAKTU BAKU STASIUN KERJA PRODUKSI SPUN PILE DI PT WASKITA BETON PRECAST, TBK PLANT PRAMBON. Project Report (Praktek Kerja Lapang). UPN VETERAN JAWA TIMUR. (Submitted)
|
Text (COVER)
COVER.pdf Download (2MB) | Preview |
|
|
Text (BAB 1)
BAB 1.pdf Download (1MB) | Preview |
|
|
Text (BAB 2)
BAB 2.pdf Download (5MB) | Preview |
|
|
Text (BAB 3)
BAB 3.pdf Download (8MB) | Preview |
|
Text (BAB 4)
BAB 4.pdf Restricted to Registered users only until 18 July 2024. Download (4MB) |
||
Text (BAB 5)
BAB 5.pdf Restricted to Registered users only until 18 July 2024. Download (316kB) |
||
|
Text (BAB 6)
BAB 6.pdf Download (399kB) | Preview |
|
|
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf Download (1MB) | Preview |
|
Text (LAMPIRAN)
LAMPIRAN.pdf Restricted to Registered users only until 18 July 2024. Download (1MB) |
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Nabila Aqiila Sande | ||||||||
Date Deposited: | 19 Jul 2022 07:41 | ||||||||
Last Modified: | 19 Jul 2022 07:41 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/7635 |
Actions (login required)
View Item |