Fata, Muhammad Zainul LAPORAN PRAKTIK KERJA LAPANG PT TRANS-PACIFIC PETROCHEMICAL INDOTAMA. Project Report (Praktek Kerja Lapang dan Magang). Reporsitory UPN Veteran Jawa Timur.
|
Text (COVER)
22031010115.-cover.pdf Download (3MB) |
|
|
Text (BAB I)
22031010115.-bab1.pdf Download (680kB) |
|
|
Text (BAB II)
22031010115.-bab2.pdf Restricted to Repository staff only until 10 October 2029. Download (328kB) |
|
|
Text (BAB III)
22031010115.-bab3.pdf Restricted to Repository staff only until 10 October 2029. Download (976kB) |
|
|
Text (BAB IV)
22031010115.-bab4.pdf Restricted to Repository staff only until 10 October 2029. Download (787kB) |
|
|
Text (BAB V)
22031010115.-bab5.pdf Restricted to Repository staff only until 10 October 2029. Download (138kB) |
|
|
Text (BAB VI)
22031010115.-bab6.pdf Restricted to Repository staff only until 10 October 2029. Download (1MB) |
|
|
Text (BAB VII)
22031010115.-bab7.pdf Restricted to Repository staff only until 10 October 2029. Download (128kB) |
|
|
Text (BAB VIII)
22031010115.-bab8.pdf Restricted to Repository staff only until 10 October 2029. Download (214kB) |
|
|
Text (BAB IX)
22031010115.-bab9.pdf Restricted to Repository staff only until 10 October 2029. Download (342kB) |
|
|
Text (BAB X)
22031010115.-bab10.pdf Restricted to Repository staff only until 10 October 2029. Download (129kB) |
|
|
Text (DAFTAR PUSTAKA)
22031010115.-daftarpustaka.pdf Restricted to Repository staff only until 10 October 2029. Download (125kB) |
Abstract
An industrial internship was conducted at PT Trans-Pacific Petrochemical Indotama (TPPI) in Tuban, East Java, from 9 March to 30 April 2026. TPPI operates an integrated refinery processing condensate and naphtha into petroleum products and aromatics, namely benzene, toluene, xylenes, and heavy aromatics. The report covers the company profile and organizational structure, process units, equipment specifications, laboratory and quality control, utilities and offsite facilities, occupational health and safety, and waste treatment. The special assignment determined the mass and heat balances of the Benzene Column in Unit 206 (Benzene–Toluene Fractionation), using Distributed Control System (DCS) operating data and laboratory analyses recorded between 21 and 30 March 2026. The mass balance based on DCS flow rates closed with an error of 0.6814%, and the component balance based on laboratory compositions gave an error of 0.1160%. Error values from the DCS and laboratory data fell below the commonly accepted industrial tolerance of 2%. The heat balance covered five pieces of equipment: the clay treater charge heater, charge exchanger, column condenser, benzene product cooler, and reboiler. The charge heater required about 33.9 GJ/h of high-pressure steam (10,762 kg/h), and the condenser rejected about 116.9 GJ/h to cooling air. Heat losses across the equipment were small, indicating stable and efficient operation of Unit 206 during the observation period.
| Item Type: | Monograph (Project Report (Praktek Kerja Lapang dan Magang)) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | T Technology > TP Chemical technology > TP155 Chemical engineering | ||||||||
| Divisions: | Faculty of Engineering > Departement of Chemical Engineering | ||||||||
| Depositing User: | Muhammad Zainul Fata | ||||||||
| Date Deposited: | 13 Oct 2026 03:13 | ||||||||
| Last Modified: | 13 Oct 2026 03:13 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/60686 |
Actions (login required)
![]() |
View Item |
