Maulana, Moh Rifqi (2029) PRA RANCANGAN PABRIK PABRIK ALUMINIUM CHLORIDE DARI ALUMINIUM METAL DAN CHLORINE DENGAN PROSES KLORINASI KAPASITAS 60.000 TON/TAHUN. Undergraduate thesis, UPN Veteran Jawa Timur.
|
Text (Cover)
22031010017.- Cover.pdf Download (1MB) |
|
|
Text (Bab 1)
22031010017.-Bab 1.pdf Download (409kB) |
|
|
Text (Bab 2)
22031010017.- bab 2.pdf Restricted to Repository staff only until 9 October 2029. Download (230kB) |
|
|
Text (Bab 3)
22031010017.- Bab 3.pdf Restricted to Repository staff only until 9 October 2029. Download (312kB) |
|
|
Text (Bab 4)
22031010017.- Bab 4.pdf Restricted to Repository staff only until 9 October 2029. Download (315kB) |
|
|
Text (Bab 4)
22031010017.- Bab 4.pdf Restricted to Repository staff only until 9 October 2029. Download (315kB) |
|
|
Text (Bab 5)
22031010017.- Bab 5.pdf Restricted to Repository staff only until 9 October 2029. Download (1MB) |
|
|
Text (Bab 6)
22031010017.- Bab 6.pdf Restricted to Repository staff only until 9 October 2029. Download (298kB) |
|
|
Text (Bab 7)
22031010017.- Bab 7.pdf Restricted to Repository staff only until 9 October 2029. Download (718kB) |
|
|
Text (Bab 8)
22031010017.- Bab 8.pdf Restricted to Repository staff only until 9 October 2029. Download (262kB) |
|
|
Text (Bab 9)
22031010017.- Bab 9.pdf Restricted to Repository staff only until 9 October 2029. Download (333kB) |
|
|
Text (Bab 10)
22031010017.- Bab 10.pdf Restricted to Repository staff only until 9 October 2029. Download (514kB) |
|
|
Text (Bab 11)
22031010017.- Bab11.pdf Download (154kB) |
|
|
Text (Daftar Pustaka)
22031010017.- Daftar Pustaka.pdf Download (163kB) |
|
|
Text (Flowsheet)
22031010017.- Flowsheet.pdf Restricted to Repository staff only Download (448kB) |
Abstract
Based on an analysis of market, technical, and economic aspects, the proposed aluminum chloride plant—utilizing aluminum metal and chlorine via a chlorination process—is deemed feasible to proceed to the planning stage. The plant is designed with a production capacity of 60,000 tons/year, operating 330 days/year on a 24-hour/day basis. Structured as a Limited Liability Company (PT) with a "Line and Staff" organizational system, the plant will employ a workforce of 185 people. It will be located in Cileles, Cikulur, Lebak Regency, Banten, occupying an area of 40,000 m². Raw material requirements consist of aluminum metal at 1,536.42 kg/hour and chlorine at 4,025.51 kg/hour. Utility requirements include water (2,510.1459 m³/day), electricity (546.5248 kWh), and fuel (1,699 L/day). Economic analysis confirms the feasibility of establishing the aluminum chloride plant. The economic analysis results are as follows: a. Total Capital Investment (TCI) : Rp 897,799,682,001.41 b. Total Production Cost (TPC) : Rp 805,622,347,588.21 c. Return on Investment (Before Tax) : 30.24% d. Return on Investment (After Tax) : 21.16% e. Internal Rate of Return (IRR) f. Pay Back Period (PBP) g. Break Even Point (BEP) : 17.14% : 4 years : 32.67%
| Item Type: | Thesis (Undergraduate) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||||||
| Subjects: | T Technology > TP Chemical technology T Technology > TP Chemical technology > TP155 Chemical engineering |
||||||||||||
| Divisions: | Faculty of Engineering > Departement of Chemical Engineering | ||||||||||||
| Depositing User: | Rifqi maulana | ||||||||||||
| Date Deposited: | 13 Oct 2026 02:55 | ||||||||||||
| Last Modified: | 13 Oct 2026 06:27 | ||||||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/60624 |
Actions (login required)
![]() |
View Item |
