Santoso, Fitra Dimas Putra Imam and Winursito, Yekti Condro (2025) Analisis Optimalisasi Beban Kerja dalam Proses Pengadaan Paralel Berbasis BPMN pada Perusahaan Migas. Project Report (Praktek Kerja Lapang dan Magang). Universitas Pembangunan Nasional "Veteran" Jawa Timur. (Unpublished)
|
Text (Cover)
21032010097-cover.pdf Download (381kB) |
|
|
Text (Bab 1)
21032010097-bab 1.pdf Download (218kB) |
|
|
Text (Bab 2)
21032010097-bab 2.pdf Download (412kB) |
|
|
Text (Bab 3)
21032010097-bab 3.pdf Restricted to Repository staff only until 1 September 2029. Download (395kB) |
|
|
Text (Bab 4)
21032010097-bab 4.pdf Restricted to Repository staff only until 1 September 2028. Download (190kB) |
|
|
Text (Bab 5)
21032010097-bab 5.pdf Restricted to Repository staff only until 1 September 2029. Download (165kB) |
|
|
Text (Daftar Pustaka)
21032010097-daftar pustaka.pdf Download (176kB) |
|
|
Text (Lampiran)
21032010097-lampiran.pdf Restricted to Repository staff only Download (550kB) |
| Item Type: | Monograph (Project Report (Praktek Kerja Lapang dan Magang)) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering T Technology > T Technology (General) > T58.6-58.62 Management Information Systems |
||||||||
| Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
| Depositing User: | Fitra Dimas Putra Imam Santoso | ||||||||
| Date Deposited: | 02 Sep 2026 02:40 | ||||||||
| Last Modified: | 02 Sep 2026 02:40 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/59569 |
Actions (login required)
![]() |
View Item |
