OPTIMALISASI PERSEDIAAN BAHAN BAKU KOIL UNTUK MANUFAKTUR PIPA MENGGUNAKAN EOQ, REORDER POINT, DAN SAFETY STOCK DI PT XYZ

Nazidan, Kemal Darma (2025) OPTIMALISASI PERSEDIAAN BAHAN BAKU KOIL UNTUK MANUFAKTUR PIPA MENGGUNAKAN EOQ, REORDER POINT, DAN SAFETY STOCK DI PT XYZ. Project Report (Praktek Kerja Lapang dan Magang). Fakultas Teknik dan Sains, Surabaya.

[img] Text (Cover)
Cover.pdf

Download (600kB)
[img] Text (Bab 1)
Bab 1.pdf

Download (264kB)
[img] Text (Bab 2)
Bab 2.pdf

Download (798kB)
[img] Text (Bab 3)
Bab 3.pdf
Restricted to Repository staff only until 31 August 2029.

Download (400kB)
[img] Text (Bab 4)
Bab 4.pdf

Download (248kB)
[img] Text (Bab 5)
Bab 5.pdf
Restricted to Repository staff only until 31 August 2029.

Download (146kB)
[img] Text (Daftar Pustaka)
Daftar Pustaka.pdf

Download (205kB)

Abstract

Steel coil raw material inventory plays an important role in ensuring the smooth production process. PT XYZ faces inventory instability, both in the form of shortages and excess stock, which causes production constraints and increases storage costs. This study aims to determine the most accurate forecasting method, calculate the economic order quantity, determine the reorder point, and determine the amount of safety stock so that inventory control is more optimal each month. The methods used include forecasting with Economic Order Quantity to predict raw material needs and calculations. Reorder Point and Safety Stock to determine the order quantity, optimal inventory, and the minimum point of raw materials for restocking. Based on the analysis results, the pattern of steel coil usage shows a seasonal trend. The forecasting results using the Weighted Moving Average method provide the smallest error rate with an MSE value of 5,856,347.80 and a MAD of 2,175.80. Through the application of the EOQ method, the optimal order quantity is 3039 tons, a reorder point of 3162 tons, and a safety stock value of 4,572.447 tons. The conclusion obtained from this study is that the forecasting and EOQ methods are able to increase the efficiency of inventory control and minimize the risk of shortages of coil raw materials every month at PT XYZ

Item Type: Monograph (Project Report (Praktek Kerja Lapang dan Magang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorNugraha, IsnaNIDN0001039501isna.nugraha.ti@upnjatim.ac.id
Subjects: T Technology > T Technology (General)
T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Kemal Darma Nazidan
Date Deposited: 01 Sep 2026 07:10
Last Modified: 01 Sep 2026 07:42
URI: https://repository.upnjatim.ac.id/id/eprint/59482

Actions (login required)

View Item View Item