ANALISIS DAN OPTIMALISASI CYCLE TIME INBOUND BARANG DENGAN TIME AND MOTION STUDY

MUNTHE, MARCELL FERNANDO N (2025) ANALISIS DAN OPTIMALISASI CYCLE TIME INBOUND BARANG DENGAN TIME AND MOTION STUDY. Project Report (Praktek Kerja Lapang dan Magang). MARCELL FERNANDO N MUNTHE.

[img] Text (Cover)
22032010027 - Cover.pdf

Download (473kB)
[img] Text (BAB I)
22032010027 - BAB I.pdf

Download (183kB)
[img] Text (BAB II)
22032010027 - BAB II.pdf
Restricted to Repository staff only until 27 August 2029.

Download (289kB)
[img] Text (BAB III)
22032010027 - BAB III.pdf
Restricted to Repository staff only until 27 August 2029.

Download (717kB)
[img] Text (BAB IV)
22032010027 - BAB IV.pdf
Restricted to Repository staff only until 27 August 2029.

Download (136kB)
[img] Text (BAB V)
22032010027 - BAB V.pdf
Restricted to Repository staff only until 27 August 2029.

Download (107kB)
[img] Text (DAFTAR PUSTAKA)
22032010027 - DAFTAR PUSTAKA.pdf
Restricted to Repository staff only until 27 August 2029.

Download (109kB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang dan Magang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorAriyani, EnnyNIDN0728097001UNSPECIFIED
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Marcell Fernando N Munthe
Date Deposited: 02 Sep 2026 03:26
Last Modified: 02 Sep 2026 03:40
URI: https://repository.upnjatim.ac.id/id/eprint/58993

Actions (login required)

View Item View Item