Wahyudi, Muhammad Dwiky (2026) Pra Rancangan Pabrik Monochlorobenzene dari Benzene dan Chlorine dengan Proses Klorinasi Kapasitas 55.000 Ton/Tahun. Undergraduate thesis, UPN Veteran Jawa Timur.
|
Text (COVER)
22031010135_Cover.pdf Download (2MB) |
|
|
Text (BAB 1)
22031010135_BAB I.pdf Download (485kB) |
|
|
Text (BAB II)
22031010135_BAB II.pdf Download (334kB) |
|
|
Text (BAB III)
22031010135_BAB III.pdf Restricted to Repository staff only until 22 July 2028. Download (356kB) | Request a copy |
|
|
Text (BAB IV)
22031010135_BAB IV.pdf Restricted to Repository staff only until 22 July 2028. Download (474kB) | Request a copy |
|
|
Text (BAB V)
22031010135_BAB V.pdf Restricted to Repository staff only until 22 July 2028. Download (735kB) | Request a copy |
|
|
Text (BAB VI)
22031010135_BAB VI.pdf Restricted to Repository staff only until 22 July 2028. Download (379kB) | Request a copy |
|
|
Text (BAB VII)
22031010135_BAB VII.pdf Restricted to Repository staff only until 22 July 2028. Download (955kB) | Request a copy |
|
|
Text (BAB VIII)
22031010135_BAB VIII.pdf Restricted to Repository staff only until 22 July 2028. Download (472kB) | Request a copy |
|
|
Text (BAB IX)
22031010135_BAB IX.pdf Restricted to Repository staff only until 22 July 2028. Download (382kB) | Request a copy |
|
|
Text (BAB X)
22031010135_BAB X.pdf Restricted to Repository staff only until 22 July 2028. Download (334kB) | Request a copy |
|
|
Text (BAB XI)
22031010135_BAB XI.pdf Restricted to Repository staff only until 22 July 2028. Download (273kB) | Request a copy |
|
|
Text (DAFTAR PUSTAKA)
22031010135_DAFTAR PUSTAKA.pdf Download (273kB) |
|
|
Text (FLOWSHEET)
22031010135_FLOWSHEET.pdf Download (990kB) |
Abstract
The growing demand for monochlorobenzene as a raw material for the pesticide, pharmaceutical, dye, rubber, and other organic chemical industries has driven the need to build a monochlorobenzene plant in Indonesia, given that domestic demand is still met through imports. This preliminary design proposes a monochlorobenzene plant with a capacity of 55,000 metric tons per year, utilizing a benzene chlorination process with chlorine using ferric chloride (FeCl₃) as a catalyst. The reaction takes place in a Bubble Column Reactor at a temperature of 40°C and a pressure of 2.4 atm, followed by a separation process using a distillation column to produce monochlorobenzene according to specifications, with dichlorobenzene as a byproduct of economic value. The plant is planned to be located in Kepuh Village, Ciwandan Subdistrict, Cilegon City, Banten Province; it will operate continuously for 330 days per year and employ 164 workers. Raw material requirements consist of 7,551.52 kg/hour of benzene and 8,599.37 kg/hour of chlorine, while utility requirements include 11,661.44 kg/hour of steam, 671.25 kWh of electricity, and 622.07 m³/hour of water. The results of the economic analysis show an FCI of Rp579.72 billion, a TCI of Rp1.06 trillion, an IRR of 12%, a pre-tax ROI of 22% and a post-tax ROI of 17%, a BEP of 30.492%, and a PBP of 3 years and 6 months.
| Item Type: | Thesis (Undergraduate) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Contributors: |
|
||||||||
| Subjects: | T Technology > TP Chemical technology T Technology > TP Chemical technology > TP155 Chemical engineering |
||||||||
| Divisions: | Faculty of Engineering > Departement of Chemical Engineering | ||||||||
| Depositing User: | Muhammad dwiky Wahyudi | ||||||||
| Date Deposited: | 23 Jul 2026 04:37 | ||||||||
| Last Modified: | 23 Jul 2026 05:48 | ||||||||
| URI: | https://repository.upnjatim.ac.id/id/eprint/57632 |
Actions (login required)
![]() |
View Item |
