PERBANDINGAN EFISIENSI PENGOLAHAN Cr⁶⁺ PADA SEDIMENT POND AREA DI PERTAMBANGAN NIKEL MELALUI NERACA MASSA DAN OPERATIONAL EXPENDITURE

Wibowo, Raden Reonald Adhi (2026) PERBANDINGAN EFISIENSI PENGOLAHAN Cr⁶⁺ PADA SEDIMENT POND AREA DI PERTAMBANGAN NIKEL MELALUI NERACA MASSA DAN OPERATIONAL EXPENDITURE. Project Report (Praktek Kerja Lapang dan Magang). ENVITATS.

This is the latest version of this item.

[img] Text
22034010102_cover.pdf

Download (1MB)
[img]
Preview
Text
22034010102.-bab 1.pdf

Download (273kB) | Preview
[img]
Preview
Text
22034010102.-bab 2.pdf

Download (378kB) | Preview
[img] Text
22034010102.-bab 3.pdf
Restricted to Repository staff only until 23 January 2029.

Download (2MB)
[img] Text
22034010102.-bab 4.pdf
Restricted to Repository staff only until 23 January 2029.

Download (221kB)
[img] Text
22034010102.-bab 5.pdf
Restricted to Repository staff only until 23 January 2029.

Download (138kB)
[img]
Preview
Text
22034010102.-daftar pustaka.pdf

Download (206kB) | Preview
[img] Text
22034010102.-lampiran.pdf
Restricted to Repository staff only

Download (6MB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang dan Magang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorRachmanto, Tuhu AgungNIDN0001056209tuhu.tl@upnjtim.ac.id
Subjects: T Technology > TD Environmental technology. Sanitary engineering
Divisions: Faculty of Engineering > Departement of Environmental Engineering
Depositing User: Reonald Adhi Wibowo
Date Deposited: 22 Jul 2026 07:06
Last Modified: 22 Jul 2026 08:06
URI: https://repository.upnjatim.ac.id/id/eprint/57280

Available Versions of this Item

  • PERBANDINGAN EFISIENSI PENGOLAHAN Cr⁶⁺ PADA SEDIMENT POND AREA DI PERTAMBANGAN NIKEL MELALUI NERACA MASSA DAN OPERATIONAL EXPENDITURE. (deposited 22 Jul 2026 07:06) [Currently Displayed]

Actions (login required)

View Item View Item