Simulasi Antrian Shipping Out pada Gudang Multiguna PT XYZ Untuk Optimalisasi Waktu Tunggu dan Peningkatan Distribusi Menggunakan Software ARENA

AHMED, QOLBI ROHIM (2026) Simulasi Antrian Shipping Out pada Gudang Multiguna PT XYZ Untuk Optimalisasi Waktu Tunggu dan Peningkatan Distribusi Menggunakan Software ARENA. Project Report (Praktek Kerja Lapang dan Magang). UNIVERSITAS PEMBANGUNAN NASIONAL "VETERAN" JAWA TIMUR.

[img] Text (COVER)
COVER.pdf

Download (1MB)
[img] Text (BAB 1)
BAB 1.pdf

Download (877kB)
[img] Text (BAB 2)
BAB 2.pdf
Restricted to Repository staff only until 19 July 2029.

Download (1MB)
[img] Text (BAB 3)
BAB 3.pdf
Restricted to Repository staff only until 19 July 2029.

Download (1MB)
[img] Text (BAB 4)
BAB 4.pdf
Restricted to Repository staff only until 19 July 2029.

Download (736kB)
[img] Text (BAB 5)
BAB 5.pdf

Download (518kB)
[img] Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (516kB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang dan Magang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorMEGA, CATTLEYA PA ISLAMINIDN0012119204mega.cattleya.ti@upnjatim.ac.id
Subjects: T Technology > T Technology (General)
T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Unnamed user with email 22032010152@student.upnjatim.ac.id
Date Deposited: 22 Jul 2026 08:48
Last Modified: 22 Jul 2026 08:48
URI: https://repository.upnjatim.ac.id/id/eprint/56171

Actions (login required)

View Item View Item