LAPORAN TUGAS PRAKTEK PROFESI PROYEK POS JAGA PURIMAS SURABAYA

HANTI, AHMAD DANI PUTRA PRATAMA R. and Lianti, Siti Nur Azizah April and Silitonga, Asti Sri Ananta and Unsa, Denanera Imana (2026) LAPORAN TUGAS PRAKTEK PROFESI PROYEK POS JAGA PURIMAS SURABAYA. Project Report (Praktek Kerja Lapang dan Magang). UPN VETERAN JAWA TIMUR, UPN VETERAN JAWA TIMUR. (Unpublished)

[img] Text
Cover.pdf
Restricted to Repository staff only until 17 July 2029.

Download (225kB) | Request a copy
[img] Text
BAB 1.pdf
Restricted to Repository staff only until 17 July 2029.

Download (171kB) | Request a copy
[img] Text
BAB 2.pdf
Restricted to Repository staff only until 20 July 2029.

Download (202kB) | Request a copy
[img] Text
BAB 3.pdf
Restricted to Repository staff only until 20 July 2029.

Download (817kB) | Request a copy
[img] Text
BAB 4.pdf
Restricted to Repository staff only until 20 July 2029.

Download (189kB) | Request a copy
[img] Text
BAB 5.pdf

Download (155kB)
[img] Text
BAB 6.pdf
Restricted to Repository staff only until 17 July 2029.

Download (148kB) | Request a copy
[img] Text
LAMPIRAN.pdf
Restricted to Repository staff only until 20 July 2029.

Download (1MB) | Request a copy

Abstract

This Professional Practice Project focused on the technical planning of the Purimas Guard Post in Surabaya, a one-story security facility designed to support access control, environmental monitoring, and information services within the Purimas residential area. The project aimed to provide students with practical experience in preparing integrated construction planning documents in accordance with professional architectural standards. The planning process included a literature review, architectural and structural design development, preparation of the Detail Engineering Design (DED), quantity calculations, Work Unit Price Analysis (AHSP), Cost Budget Plan (RAB), and Work Plan and Technical Specifications (RKS). The resulting DED consists of site plans, floor plans, elevations, sections, structural details, door and window details, roof plans, interior visualizations, and supporting construction drawings. The guard post was designed with an emphasis on security, spatial efficiency, operational convenience, user comfort, ease of construction, and building maintenance. Based on the quantity calculations and unit price analysis, the estimated construction cost was IDR 125,777,740, rounded to IDR 125,780,000. The preparation of the RKS further established the required materials, construction methods, quality standards, and technical requirements for project implementation. Overall, this professional practice project improved the students’ understanding of the relationship between design documents, technical specifications, and cost control, while also strengthening their accuracy, coordination, teamwork, and professional responsibility in producing accountable construction planning documents

Item Type: Monograph (Project Report (Praktek Kerja Lapang dan Magang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
UNSPECIFIEDFitriyanto, Dominikus AdityaNIDN0006058910dominikus_aditya.ar@upnjatim.ac.id
Subjects: N Fine Arts > NA Architecture > NA2695-2793 Architectural drawing and design
Divisions: Faculty of Architecture and Design > Departement of Architecture
Depositing User: AHMAD DANI PUTRA PRATAMA RAHMANDA HANTI
Date Deposited: 20 Jul 2026 04:13
Last Modified: 20 Jul 2026 04:13
URI: https://repository.upnjatim.ac.id/id/eprint/55978

Actions (login required)

View Item View Item