Usulan Perbaikan Tata Letak Raw Material Cable Pada Gudang Pusat Menggunakan Metode ABC (Studi Kasus: PT PAL Indonesia)

Mulya, Ulwan Adi (2026) Usulan Perbaikan Tata Letak Raw Material Cable Pada Gudang Pusat Menggunakan Metode ABC (Studi Kasus: PT PAL Indonesia). Project Report (Praktek Kerja Lapang dan Magang). Universitas Pembangunan Nasional Veteran JawaTimur, Indonesia. (Unpublished)

[img]
Preview
Text (Cover)
21032010206_COVER.pdf

Download (1MB) | Preview
[img]
Preview
Text (BAB 1)
21032010206_BAB 1.pdf

Download (746kB) | Preview
[img] Text (BAB 2)
21032010206_BAB 2.pdf
Restricted to Repository staff only until 26 May 2029.

Download (3MB)
[img] Text (BAB 3)
21032010206_BAB 3.pdf
Restricted to Repository staff only until 26 May 2029.

Download (5MB)
[img] Text (BAB 4)
21032010206_BAB 4.pdf
Restricted to Repository staff only until 26 May 2029.

Download (296kB)
[img]
Preview
Text (BAB 5)
21032010206_BAB 5.pdf

Download (363kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
21032010206_DAFTAR PUSTAKA.pdf

Download (265kB) | Preview
Item Type: Monograph (Project Report (Praktek Kerja Lapang dan Magang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
ConsultantRahmawati, NurNIDN0701088702UNSPECIFIED
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD30.28 Strategic Planning
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Ulwan Adi Mulya
Date Deposited: 26 May 2026 09:02
Last Modified: 26 May 2026 09:03
URI: https://repository.upnjatim.ac.id/id/eprint/52821

Actions (login required)

View Item View Item