ANALISIS USULAN PENJADWALAN PREVENTIVE MAINTENANCE DENGAN METODE RELIABILITY CENTERED MAINTENANCE II (RCM II) PADA MESIN WELDING DI PT INDUSTRI KERETA API (PERSERO)

Kamaluddin, Alief Ahmad (2026) ANALISIS USULAN PENJADWALAN PREVENTIVE MAINTENANCE DENGAN METODE RELIABILITY CENTERED MAINTENANCE II (RCM II) PADA MESIN WELDING DI PT INDUSTRI KERETA API (PERSERO). Undergraduate thesis, Universitas Pembangunan Nasional "Veteran" Jawa Timur.

[img]
Preview
Text (Cover)
22032010146 - cover.pdf

Download (2MB) | Preview
[img]
Preview
Text (BAB 1)
22032010146 - bab1.pdf

Download (222kB) | Preview
[img] Text (BAB 2)
22032010146 - bab2.pdf
Restricted to Repository staff only until 30 May 2029.

Download (1MB)
[img] Text (BAB 3)
22032010146 - bab3.pdf
Restricted to Repository staff only until 30 May 2029.

Download (268kB)
[img] Text (BAB 4)
22032010146 - bab4.pdf
Restricted to Repository staff only until 30 May 2029.

Download (938kB)
[img]
Preview
Text (BAB 5)
22032010146 - bab5.pdf

Download (203kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
22032010146 - daftarpustaka.pdf

Download (180kB) | Preview
[img] Text (LAMPIRAN)
22032010146 - lampiran.pdf
Restricted to Repository staff only until 30 May 2029.

Download (2MB)

Abstract

PT Industri Kereta Api (Persero) is a national railway vehicle manufacturer that is highly dependent on the Reliability of its production machinery, particularly The Gas Metal Arc Welding (GMAW) XD350S machine at PT Industri Kereta Api (Persero) recorded 30 failure incidents with 4,550 minutes of total downtime in 2025, contributing 77% of overall welding machine downtime. The existing three-month preventive maintenance policy has proven insufficient in reducing unplanned breakdowns. This study aims to identify critical components and determine optimal maintenance intervals using the Reliability Centered Maintenance II (RCM II) method, through FMEA analysis, Weibull distribution testing, and MTTF and MTTR calculations. Four critical components were identified: Wire Feeder, Welding Control PCB, Feed Roller, and Inner Liner, with optimal maintenance intervals of 2,115.05, 3,900.67, 1,598.39, and 1,975.42 hours, respectively. Implementation of this RCM II-based schedule is expected to minimize unplanned downtime and improve machine reliability at PT INKA (Persero).

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSaifuddin, Joumil AidilNIDN0718036203UNSPECIFIED
Subjects: T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Alief Ahmad Kamaluddin
Date Deposited: 26 May 2026 07:57
Last Modified: 26 May 2026 07:57
URI: https://repository.upnjatim.ac.id/id/eprint/52709

Actions (login required)

View Item View Item