Studi Kinerja Reaktor Reforming Hidrogen Plant PT. Kilang Pertamina Internasional -RU VI Balongan Indramayu, Jawa Barat

Rizki, Muhammad Miftahul (2025) Studi Kinerja Reaktor Reforming Hidrogen Plant PT. Kilang Pertamina Internasional -RU VI Balongan Indramayu, Jawa Barat. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur, Surabaya, Jawa Timur. (Unpublished)

[img] Text (COVER)
COVER..pdf

Download (1MB)
[img] Text (BAB 1)
BAB 1 PKL.pdf

Download (148kB)
[img] Text (BAB 2)
BAB 2 PKL.pdf

Download (212kB)
[img] Text (BAB 3)
BAB 3 PKL.pdf
Restricted to Repository staff only until 11 September 2028.

Download (197kB)
[img] Text (BAB 4)
BAB 4 PKL.pdf
Restricted to Repository staff only until 11 September 2028.

Download (3MB)
[img] Text (BAB 5)
BAB 5 PKL.pdf
Restricted to Repository staff only until 11 September 2028.

Download (98kB)
[img] Text (BAB 6)
BAB 6 PKL.pdf

Download (194kB)
[img] Text (BAB 7)
BAB 7 PKL.pdf

Download (86kB)
[img] Text (DAFTAR PUSTAKA)
DAFPUSS.pdf

Download (93kB)

Abstract

PT Kilang Pertamina Internasional - RU VI Balongan is the sixth of seven refineries under the Refining Directorate of PT Pertamina (Persero). Its primary business activity is processing crude oil into fuel oil (BBM), non-fuel oil, and petrochemical products. RU VI Balongan was established in 1990 and began operations in 1994. The refinery is located in Indramayu (West Java), approximately 200 km east of Jakarta, with operations spanning Balongan, Mundu, and Salam Darma. The raw materials processed at RU VI Balongan are Duri and Minas crude oil from Riau Province. This refinery was built through the Export-Oriented Refinery I (EXOR-I) project with the aim of increasing added value for the country through oil, gas, and non-oil and gas exports, in accordance with government policy. In 2003, the Balongan oil refinery underwent phase one of revamping. Furthermore, the refinery also expanded to increase production capacity to 130 MBSD, with a ratio of 50% Duri crude oil and 50% Minas crude oil. In 2005, the refinery expanded by establishing the Balongan Blue Sky Refinery (KLBB) with a design capacity of 52 MBSD. In 2008, the Balongan refinery underwent phase two of revamping to increase propylene production. In 2013, another expansion in the petrochemical sector was carried out with the construction of the ROPP refinery. At the end of 2015, management of the Mundu LPG Refinery was transferred to the Directorate of Gas and New and Renewable Energy. Subsequently, in 2016, the refinery developed a special fuel product (BBK), Pertalite RON 90. Then, Pertamax Plus RON 95 was developed into Pertamax Turbo RON 98 and launched on July 13, 2016. Also in 2016, the refinery worked on Phase I of the Avtur Project, optimizing and converting the Process Unit to produce the product. In July 2017, the refinery began producing Pertamax Turbo with EURO IV-compliant quality. In line with future business demands, PT Kilang Pertamina Internasional - RU VI Balongan continues to develop its business potential through the application of new technologies, the development of new superior products, and the implementation of international standards in its quality management system, while remaining committed to environmental friendliness.

Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSutiyono, SutiyonoNIDN0713076003UNSPECIFIED
Subjects: Q Science > QD Chemistry
Divisions: Faculty of Engineering > Departement of Chemical Engineering
Depositing User: Miftahul Muhammad
Date Deposited: 15 Sep 2025 03:08
Last Modified: 15 Sep 2025 03:08
URI: https://repository.upnjatim.ac.id/id/eprint/42954

Actions (login required)

View Item View Item