Analisis Waktu Baku Dan Optimalisasi Kebutuhan Tenaga Kerja Pada Lini Manual-A di PT. Vitapharm Menggunakan Metode Jam Henti (Stopwatch Time Study)

Sugianto, Moch. Febri Analisis Waktu Baku Dan Optimalisasi Kebutuhan Tenaga Kerja Pada Lini Manual-A di PT. Vitapharm Menggunakan Metode Jam Henti (Stopwatch Time Study). Project Report (Praktek Kerja Lapang). JIEOM. (Unpublished)

[img] Text (Cover)
21032010120.-cover.pdf

Download (766kB)
[img] Text (Bab 1)
21032010120.-bab1.pdf

Download (260kB)
[img] Text (Bab 2)
21032010120.-bab2.pdf

Download (724kB)
[img] Text (Bab 3)
21032010120.-bab3.pdf
Restricted to Repository staff only until 14 July 2028.

Download (520kB)
[img] Text (Bab 4)
21032010120.-bab4.pdf
Restricted to Repository staff only until 14 July 2028.

Download (185kB)
[img] Text (Bab 5)
21032010120.-bab5.pdf
Restricted to Repository staff only until 14 July 2028.

Download (172kB)
[img] Text (Daftar Pustaka)
21032010120.-daftarpustaka.pdf

Download (180kB)
[img] Text (Lampiran)
21032010120.-lampiran.pdf
Restricted to Repository staff only until 14 July 2028.

Download (3MB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
UNSPECIFIEDRusindiyanto, RusindiyantoNIDN0725026501UNSPECIFIED
Subjects: T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Moch. Febri Sugianto
Date Deposited: 14 Jul 2025 04:43
Last Modified: 14 Jul 2025 04:43
URI: https://repository.upnjatim.ac.id/id/eprint/39479

Actions (login required)

View Item View Item