PERANCANGAN BANGUNAN PENGOLAHAN AIR BUANGAN, AIR LIMBAH INDUSTRI PENGOLAHAN DAGING

NINGRUM, DWI MULYATI and CLAUDYA, AGNES LIDYA (2025) PERANCANGAN BANGUNAN PENGOLAHAN AIR BUANGAN, AIR LIMBAH INDUSTRI PENGOLAHAN DAGING. Undergraduate thesis, UPN Veteran Jawa Timur.

This is the latest version of this item.

[img] Text (COVER)
21034010081_COVER.pdf

Download (3MB)
[img] Text (BAB 1)
21034010081_BAB 1.pdf

Download (72kB)
[img] Text
21034010081_BAB 2.pdf

Download (533kB)
[img] Text (BAB 3)
21034010081_BAB 3.pdf
Restricted to Repository staff only until 13 July 2028.

Download (164kB)
[img] Text (BAB 4)
21034010081_BAB 4.pdf
Restricted to Repository staff only until 13 July 2028.

Download (266kB)
[img] Text (BAB 5)
21034010081_BAB 5.pdf
Restricted to Repository staff only until 13 July 2028.

Download (805kB)
[img] Text (BAB 6)
21034010081_BAB 6.pdf
Restricted to Repository staff only until 13 July 2028.

Download (164kB)
[img] Text (BAB 7)
21034010081_BAB 7.pdf
Restricted to Repository staff only until 13 July 2028.

Download (195kB)
[img] Text (DAFTAR PUSTAKA)
21034010081_DAFTAR PUSTAKA.pdf

Download (143kB)
[img] Text (LAMPIRAN)
21034010081_LAMPIRAN.pdf
Restricted to Repository staff only until 13 July 2028.

Download (10MB)
Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorJawwad, Muhammad Abdus SalamNIDN0027079403muhammad.abdus.tl@upnjatim.ac.id
Subjects: T Technology > TD Environmental technology. Sanitary engineering
Divisions: Faculty of Engineering > Departement of Environmental Engineering
Depositing User: Agnes Lidya Claudya
Date Deposited: 21 Jul 2025 04:03
Last Modified: 21 Jul 2025 04:03
URI: https://repository.upnjatim.ac.id/id/eprint/39469

Available Versions of this Item

Actions (login required)

View Item View Item