ANALISIS BEBAN KERJA OPERATOR MENGGUNAKAN METODE FTE PADA PROSESPENGISIAN BIG BAG DI LINI PRODUKSI MP1

Putri, Nadya Permata ANALISIS BEBAN KERJA OPERATOR MENGGUNAKAN METODE FTE PADA PROSESPENGISIAN BIG BAG DI LINI PRODUKSI MP1. Project Report (Praktek Kerja Lapang). -. (Unpublished)

[img] Text (Cover)
21032010146-cover.pdf

Download (642kB)
[img] Text (Bab 1)
21032010146-bab1.pdf

Download (211kB)
[img] Text (Bab 2)
21032010146-bab2.pdf
Restricted to Repository staff only until 20 June 2028.

Download (81kB)
[img] Text (Bab 3)
21032010146-bab3.pdf
Restricted to Repository staff only until 20 June 2028.

Download (15kB)
[img] Text (Daftar Pustaka)
21032010146-daftarpustaka.pdf

Download (10kB)
[img] Text (Lampiran)
21032010146-lampiran.pdf
Restricted to Repository staff only until 20 June 2028.

Download (3MB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSyaifullah, HafidNIDN0017108907hafid.s.ti@upnjatim.ac.id
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Nadya Permata Putri
Date Deposited: 20 Jun 2025 07:16
Last Modified: 20 Jun 2025 07:16
URI: https://repository.upnjatim.ac.id/id/eprint/38847

Actions (login required)

View Item View Item