Adjietama, Mochammad Novrizal (2025) Penerapan Konsep Lean Warehousing Untuk Minimasi Pemborosan Gudang Suku Cadang Dengan Menggunakan Metode VSM Pada PT Petrokimia Gresik. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur, Surabaya. (Unpublished)
![]() |
Text (Cover)
Cover.pdf Download (388kB) |
![]() |
Text (Bab 1)
Bab 1.pdf Download (122kB) |
![]() |
Text (Bab 2)
Bab 2.pdf Download (676kB) |
![]() |
Text (Bab 3)
Bab 3.pdf Restricted to Repository staff only until 18 June 2028. Download (352kB) |
![]() |
Text (Bab 4)
Bab 4.pdf Restricted to Repository staff only until 18 June 2028. Download (108kB) |
![]() |
Text (Bab 5)
Bab 5.pdf Download (77kB) |
![]() |
Text (Daftar Pustaka)
Daftar Pustaka.pdf Download (103kB) |
![]() |
Text (Lampiran)
Lampiran.pdf Download (230kB) |
Abstract
PT ABC is a company operating in the fertilizer industry, playing a vital role in supporting the national agricultural sector. One of the key elements in maintaining smooth operations is warehouse management, which encompasses the processes of receiving, storing, and distributing materials. Efficient warehouse management is essential to ensure a smooth material flow, minimize waste, and support overall operational efficiency. This study aims to analyze and identify waste occurring in PT ABC’s warehouse using the Lean Warehousing approach, the Value Stream Mapping (VSM) method, and the Pareto Diagram. Initial analysis revealed that the Process Cycle Efficiency (PCE) value of 68.92% indicated potential waste in warehouse activities. The main sources of waste were identified in several activities, making the optimization of waiting-type waste a priority. Improvement alternatives were implemented using the 5S principles, which include sorting materials (seiri), reorganizing warehouse layouts (seiton), implementing routine cleanliness (seiso), standardizing SOPs (seiketsu), and fostering work discipline (shitsuke). With these improvements, the estimated PCE value increased to 80.95%, reflecting a 12.03% efficiency improvement. This study demonstrates that implementing Lean Warehousing is effective in optimizing warehouse management at PT ABC.
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | MOCHAMMAD NOVRIZAL ADJIETAMA | ||||||||
Date Deposited: | 20 Jun 2025 03:53 | ||||||||
Last Modified: | 20 Jun 2025 03:53 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/38336 |
Actions (login required)
![]() |
View Item |