Optimasi Penggunaan dan Perawatan Pada Mesin Unit Phonska IV Untuk Meningkatkan Produksi Pupuk Pada PT XYZ

Agustina, Endang (2025) Optimasi Penggunaan dan Perawatan Pada Mesin Unit Phonska IV Untuk Meningkatkan Produksi Pupuk Pada PT XYZ. Project Report (Praktek Kerja Lapang). Jurnal Teknik Industri Terintegrasi. (Unpublished)

[img] Text (cover)
21032010037-cover.pdf

Download (442kB)
[img] Text (bab 1)
21032010037-bab 1.pdf

Download (126kB)
[img] Text (bab 2)
21032010037-bab 2.pdf
Restricted to Repository staff only until 17 June 2027.

Download (411kB)
[img] Text (bab 3)
21032010037-bab 3.pdf
Restricted to Repository staff only until 17 June 2027.

Download (667kB)
[img] Text (bab 4)
21032010037-bab 4.pdf
Restricted to Repository staff only until 17 June 2027.

Download (177kB)
[img] Text (bab 5)
21032010037-bab 5.pdf

Download (119kB)
[img] Text (daftar pustaka)
21032010037-daftar pustaka.pdf

Download (178kB)
[img] Text (lampiran)
21032010037-lampiran.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

PT XYZ is a company engaged in the production of fertilizers. With the monthly targets that must be met. The phonka IV unit has several categories of machines such as the Rotating category, the Instrument category, the Electrical category, each category has several problems with its components. So that it can reduce the production that must be achieved and financial losses due to Downtime. Therefore, Company XYZ must calculate to find out the most optimal time interval to reduce damage to each category of its machines. The method used to solve this problem is to use the FMEA and RCM methods with the help of excel and minitab software to facilitate data calculations. The results of data processing show that the total RPN obtained with a total of 470. After calculating the Company's interval. The Rotation category should be done every 31.61 hours, for the Instrument category it should be done every 2.81 hours, for the Electrical category it should be done every 2.83 hours. Then the Company can find out the planned schedule.

Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSari, Rizqi NovitaNIDN0021119103rizqi.novita.ti@upnjatim.ac.id
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
T Technology > TS Manufactures
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Endang Agustina -
Date Deposited: 20 Jun 2025 03:06
Last Modified: 20 Jun 2025 03:06
URI: https://repository.upnjatim.ac.id/id/eprint/38070

Actions (login required)

View Item View Item