PERANCANGAN TATA LETAK WORKSHOP MENGGUNAKAN METODE SYSTEMATIC LAYOUT PLANNING (SLP) DI PERGUDANGAN CENTRAL INDUSTRIAL PARK

Nuraini, Siti Arifah (2025) PERANCANGAN TATA LETAK WORKSHOP MENGGUNAKAN METODE SYSTEMATIC LAYOUT PLANNING (SLP) DI PERGUDANGAN CENTRAL INDUSTRIAL PARK. Project Report (Praktek Kerja Lapang). JUTIN: Jurnal Teknik Industri Terintegrasi. (Unpublished)

[img] Text (Cover)
21032010113-Cover.pdf

Download (1MB)
[img] Text (Bab 1)
21032010113-Bab I.pdf

Download (102kB)
[img] Text (Bab 2)
21032010113-Bab II.pdf
Restricted to Repository staff only until 2027.

Download (68kB)
[img] Text (Bab 3)
21032010113-Bab III.pdf
Restricted to Repository staff only until 2027.

Download (365kB)
[img] Text (Bab 4)
21032010113-Bab IV.pdf
Restricted to Repository staff only until 2027.

Download (34kB)
[img] Text (Bab 5)
21032010113-Bab V.pdf

Download (31kB)
[img] Text (Daftar Pustaka)
21032010113-Daftar Pustaka.pdf

Download (89kB)
[img] Text (Lampiran)
21032010141-Lampiran.pdf
Restricted to Repository staff only until 2027.

Download (964kB)

Abstract

In the industrial world, the issue of factory layout and the layout of production facilities and equipment is one that plays an important role in increasing company productivity. Inappropriate layout can cause material transfer time to be ineffective due to the long distance between stations. Central Industrial Park (CIP) is a warehouse area in Sidoarjo Regency. This research aims to improve and create a new layout of facilities in the workshop warehouse in the CIP area. Data processing was carried out using the Systematic Layout Planning (SLP) method with the help of Blocplan 90 software. This research produced Adj values. Score of 0.80. The R-score value is 0.78 and has an R-Dist score value of 355. The results of research on layout improvements found a length of 18.5 meters and a width of 15 meters.

Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorDewi, SintaNIDN0730088801UNSPECIFIED
Subjects: T Technology > TS Manufactures
T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Siti Arifah Nuraini
Date Deposited: 17 Jun 2025 08:27
Last Modified: 17 Jun 2025 08:27
URI: https://repository.upnjatim.ac.id/id/eprint/37955

Actions (login required)

View Item View Item