Analisa Operasional Pembangkit Listrik Guna Meningkatkan Efisiensi Menggunakan Metode Energy Value Stream Mapping (EVSM) dan Failure Mode and Effects Analysis (FMEA) Pada Unit PLTGU di PT PLN Nusantara Power UP Gresik

Nuraini, Siti Arifah (2025) Analisa Operasional Pembangkit Listrik Guna Meningkatkan Efisiensi Menggunakan Metode Energy Value Stream Mapping (EVSM) dan Failure Mode and Effects Analysis (FMEA) Pada Unit PLTGU di PT PLN Nusantara Power UP Gresik. Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (Cover)
21032010113-Cover.pdf

Download (1MB)
[img] Text (Bab 1)
21032010113-Bab I.pdf

Download (135kB)
[img] Text (Bab 2)
21032010113-Bab II.pdf
Restricted to Repository staff only until 16 June 2027.

Download (448kB)
[img] Text (Bab 3)
21032010113-Bab III.pdf
Restricted to Repository staff only until 16 June 2027.

Download (90kB)
[img] Text (Bab 4)
21032010113-Bab IV.pdf
Restricted to Repository staff only until 16 June 2027.

Download (1MB)
[img] Text (Bab 5)
21032010113-Bab V.pdf

Download (47kB)
[img] Text (Daftar Pustaka)
21032010113-Daftar Pustaka.pdf

Download (48kB)
[img] Text (Lampiran)
21032010113-Lampiran.pdf
Restricted to Repository staff only until 16 June 2027.

Download (1MB)

Abstract

The government builds power Plants with adequate capacity and quantity to meet human needs. In the process of generating electricity does not always run well. This study aims to improve the efficiency of the operational process by minimizing the Heat rate value that occurs in the PLTGU unit using the Energy Value Steam Mapping (EVSM) and Failure Mode And Effects Analysis (FMEA) methods. The results of the study showed that the high heat rate in Gas Turbine 1.1 and Steam Turbine was caused by fouling in the Compressor Gas Turbine, Corrosion or material damage to the HP Evaporator HRSG, and leakage in the Steam Turbine condenser. The overall heat rate in the block I generating unit before the repair was 1,432.63 kcal/kwh. Then after the proposed repair projection, it was only 830.63 kcal/kwh. This means that there is a decrease in the heat rate in the operational process of 602.01 kcal/kwh or a percentage of 42.02%.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSaifuddin, Joumil AidilNID196203181993031001joumilaidil.ti@upnjatim.ac.id
Thesis advisorWinursito, Yekti CondroNID21119920813288yekti.condro.ti@upnjatim.ac.id
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
T Technology > TJ Mechanical engineering and machinery
T Technology > TS Manufactures
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Siti Arifah Nuraini
Date Deposited: 17 Jun 2025 08:27
Last Modified: 17 Jun 2025 08:27
URI: https://repository.upnjatim.ac.id/id/eprint/37935

Actions (login required)

View Item View Item