IMPLEMENTASI MANAJAMEN RISIKO Studi Kasus : Alur Pengadaan Jasa Rutin pada Unit Maintenance Planing & Evaluation di PT Semen Indonesia (Persero) Tbk Melalui Pendekatan Risk Assestment

Rafida, Halimas Nafi (2025) IMPLEMENTASI MANAJAMEN RISIKO Studi Kasus : Alur Pengadaan Jasa Rutin pada Unit Maintenance Planing & Evaluation di PT Semen Indonesia (Persero) Tbk Melalui Pendekatan Risk Assestment. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)

[img] Text (COVER PKL)
21032010110_COVER PKL.pdf

Download (636kB)
[img] Text (BAB 1 PKL)
21032010110_BAB I PKL.pdf

Download (200kB)
[img] Text (BAB 2 PKL)
21032010110_BAB II PKL.pdf
Restricted to Repository staff only until 16 June 2027.

Download (525kB)
[img] Text (BAB 3 PKL)
21032010110_BAB III PKL.pdf
Restricted to Repository staff only until 16 June 2027.

Download (424kB)
[img] Text (BAB 4 PKL)
21032010110_BAB IV PKL.pdf
Restricted to Repository staff only until 16 June 2027.

Download (188kB)
[img] Text (BAB 5 PKL)
21032010110_BAB V PKL.pdf
Restricted to Repository staff only until 16 June 2027.

Download (185kB)
[img] Text (DAFTAR PUSTAKA PKL)
21032010110_DAFPUS PKL.pdf

Download (182kB)
[img] Text (LAMPIRAN PKL)
21032010110_LAMPIRAN.pdf
Restricted to Repository staff only until 16 June 2027.

Download (723kB)

Abstract

The procurement of goods and services is a crucial step for a company, designed to support the implementation of operational activities. This activity plays a vital role in the company's operations and is often faced with potential risks, necessitating precise and optimal risk mitigation. This study was conducted on one unit at PT XXX to analyze and develop risk mitigation strategies in the procurement process, specifically for routine services. The approach used in this study is risk assessment. The research methods include primary data collection through interviews and observations, as well as related references. The results show that out of 16 activities in the routine service procurement process, 23 risk analyses were identified. These risks were then categorized according to their risk levels: 5 high-level risks, 17 medium level risks, and 1 low-level risk. The risk mitigation strategy planning focuses on high-level risks to control and reduce their impact.

Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorRusindiyanto, RusindiyantoNIDN0725026501UNSPECIFIED
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Halimas Nafi Rafida
Date Deposited: 17 Jun 2025 08:23
Last Modified: 17 Jun 2025 08:23
URI: https://repository.upnjatim.ac.id/id/eprint/37917