PROYEK JALAN TOL PROBOLINGGO – BANYUWANGI PAKET 3

AL HABSYI, ALI ZAINAL ABIDIN ISA and WAHYUDI, IFTHAR RAMADHANA (2025) PROYEK JALAN TOL PROBOLINGGO – BANYUWANGI PAKET 3. Project Report (Praktek Kerja Lapang). Universitas Pembangunan Nasional Veteran Jawa Timur.

[img] Text (COVER)
21035010074.-Cover.pdf

Download (1MB)
[img] Text (BAB 1)
21035010074.-BAB 1.pdf

Download (582kB)
[img] Text (BAB 2)
21035010074.-BAB 2.pdf

Download (1MB)
[img] Text (BAB 3)
21035010074.-BAB 3.pdf
Restricted to Repository staff only until 2028.

Download (1MB)
[img] Text (BAB 4)
21035010074.-BAB 4.pdf
Restricted to Repository staff only until 2028.

Download (4MB)
[img] Text (BAB 5)
21035010074.-BAB 5.pdf
Restricted to Repository staff only until 2028.

Download (240kB)
[img] Text (BAB 6)
21035010074.-BAB 6.pdf
Restricted to Repository staff only until 2028.

Download (797kB)
[img] Text (BAB 7)
21035010074.-BAB 7.pdf
Restricted to Repository staff only until 2028.

Download (989kB)
[img] Text (BAB 8)
21035010074.-BAB 8.pdf
Restricted to Repository staff only until 2028.

Download (238kB)
[img] Text (BAB 9)
21035010074.-BAB 9.pdf
Restricted to Repository staff only until 2028.

Download (2MB)
[img] Text (BAB 10)
21035010074.-BAB 10.pdf
Restricted to Registered users only until 2028.

Download (1MB)
[img] Text (BAB 11)
21035010074.-BAB 11.pdf

Download (129kB)
[img] Text (DAFTAR PUSTAKA)
21035010074.-DAFTAR PUSTAKA.pdf

Download (187kB)
[img] Text (LAMPIRAN)
21035010074.-LAMPIRAN.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

This internship report discusses the experience and outcomes of the MBKM internship program conducted on the Probolinggo–Banyuwangi Toll Road Construction Project Package 3, managed by PT Wijaya Karya (Persero) Tbk. The internship aimed to provide students with practical understanding of toll road construction project management, covering aspects such as administration, project organization, heavy equipment management, and on-site construction techniques. The report reviews the project’s organizational structure, contract administration, heavy equipment productivity calculations, as well as the implementation of legal, labor, and occupational health and safety (OHS) aspects in the field. It also covers ground improvement technologies, environmental management techniques, foundation construction methods, and the construction of long-span bridge structures. Through this internship, students gained direct experience in managing large-scale infrastructure projects, understood both technical and non-technical challenges on-site, and were able to comprehensively apply civil engineering knowledge in real-world professional settings. This report is expected to serve as a reference and learning resource for students and relevant stakeholders in the implementation of toll road construction projects in Indonesia.

Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Scientific advisorWibisana, Hendrata0708126501hendrata.ts@upnjatim.ac.id
Scientific advisorPutri, Karina Meilawati Eka3855772673230272karina.meilawati.ft@upnjatim.ac.id
Additional Information: Project Report (Praktek Kerja Lapangan)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TE Highway engineering. Roads and pavements
T Technology > TG Bridge engineering
Divisions: Faculty of Engineering > Departement of Civil Engineering
Depositing User: ALI ALHABSYI
Date Deposited: 20 Jun 2025 03:13
Last Modified: 20 Jun 2025 03:13
URI: https://repository.upnjatim.ac.id/id/eprint/36270

Actions (login required)

View Item View Item