ANALISIS PENGENDALIAN BAHAN BAKU PLATE DENGAN METODE CONTINUOUS REVIEW SYSTEM DI PT. PAL INDONESIA

Ganendra, Devara Priya (2025) ANALISIS PENGENDALIAN BAHAN BAKU PLATE DENGAN METODE CONTINUOUS REVIEW SYSTEM DI PT. PAL INDONESIA. Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (cover)
Cover_Kata pengantar.pdf

Download (1MB)
[img] Text (bab1)
19032010180.-bab1.pdf

Download (77kB)
[img] Text (bab2)
19032010180.-bab2.pdf
Restricted to Repository staff only until 10 March 2027.

Download (243kB)
[img] Text (bab3)
19032010180.-bab3.pdf
Restricted to Repository staff only until 10 March 2027.

Download (176kB)
[img] Text (bab4)
19032010180.-bab4.pdf
Restricted to Repository staff only until 10 March 2027.

Download (513kB)
[img] Text (bab5)
19032010180.-bab5.pdf
Restricted to Repository staff only until 10 March 2027.

Download (11kB)
[img] Text (daftarpustaka)
19032010180.-daftarpustaka.pdf
Restricted to Repository staff only until 10 March 2027.

Download (116kB)
[img] Text (lampiran)
19032010180.-lampiran.pdf
Restricted to Repository staff only

Download (534kB)

Abstract

In today's era of globalization, many new companies have emerged, both companies engaged in services, manufacturing, and trade. One of the largest assets in the company PT. XYZ is raw material inventory. Raw material inventory is goods that are stored and used for the production process that are adjusted to the usage schedule. Therefore, in order to avoid high raw material inventory costs, the company must have a proper raw material inventory system by using the proposed method as a comparison, namely the continuous review system method. Plate inventory control was obtained in August 2023 - July 2024 with a total inventory cost using the company method of IDR 292,324,000 and the Continuous Review (s, Q) System method of IDR 144,722,000 with cost savings of IDR 147,602,000 and a cost reduction percentage of 50.4%. After forecasting the plate requirements for August 2023 - July 2024, plate inventory control was obtained with an order quantity of 6,560 sheets and a reorder point of 846 sheets with a total inventory cost of IDR 220,902,000.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorAryanny, EnnyNIDN0728097001enny.ti@upnjatim.ac.id
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Devara priya Ganendra
Date Deposited: 14 Mar 2025 06:33
Last Modified: 14 Mar 2025 06:33
URI: https://repository.upnjatim.ac.id/id/eprint/35428

Actions (login required)

View Item View Item