Analasis Produktivitas Tenaga Kerja Pada Pekerjaan Pasangan Bata Ringan Menggunakan Metode Work Sampling (Studi Kasus: Proyek Pakuwon Residence Bekasi Mixed Use Development)

Fadillah, Naufal Luthfi (2025) Analasis Produktivitas Tenaga Kerja Pada Pekerjaan Pasangan Bata Ringan Menggunakan Metode Work Sampling (Studi Kasus: Proyek Pakuwon Residence Bekasi Mixed Use Development). Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (Cover)
cover awal_merged.pdf

Download (2MB)
[img] Text (BAB I)
BAB I-1.pdf

Download (1MB)
[img] Text (BAB II)
BAB II.pdf
Restricted to Repository staff only until 20 January 2026.

Download (7MB)
[img] Text (BAB III)
BAB III.pdf
Restricted to Repository staff only until 20 January 2026.

Download (1MB)
[img] Text (BAB IV)
BAB IV.pdf
Restricted to Repository staff only until 20 January 2026.

Download (6MB)
[img] Text (BAB V)
BAB V.pdf

Download (362kB)
[img] Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (307kB)
[img] Text (LAMPIRAN)
LAMPIRAN.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

One of the important elements in the construction process is lightweight brick work. Labor productivity in this work is very influential on the progress of the construction project as a whole. One method that can be applied to analyze labor productivity is work sampling, which is an observation method used to measure and analyze the productivity of workers or activities at a certain time. This study aims to investigate and analyze labor productivity of lightweight brick work labor. The work sampling method was chosen to analyze the productivity and quantity of labor in lightweight brick work on the Bekasi Mixed Use Development Pakuwon Residence project. Based on the analysis and discussion during the 10-day observation period, 8 lightweight brick masonry workers completed work with a total area of 658,480 m2 and obtained a productivity value of 52,730 m2/day. In addition, from the results of field observations, the level of worker adjustment factors and allowances can still be increased, with the hope that this increase will significantly increase worker productivity in terms of time, quality, and quantity.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorPutra, I Nyoman Dita PahangNIDN0717037003putra_indp.ts@upnjatim.ac.id
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: Faculty of Engineering > Departement of Civil Engineering
Depositing User: Naufal Luthfi Fadillah
Date Deposited: 03 Sep 2025 05:43
Last Modified: 03 Sep 2025 05:43
URI: https://repository.upnjatim.ac.id/id/eprint/34189

Actions (login required)

View Item View Item