PERTIWI, MELDI RAMAHDANI INTAN (2025) PABRIK SODIUM TRIPOLYPHOSPATE DARI NATRIUM CARBONATE DAN ASAM PHOSPHATE DENGAN PROSES KOMBINASI. Undergraduate thesis, UPN "VETERAN" JATIM.
Text (COVER)
18031010018 - COVER.pdf Download (2MB) |
|
Text (BAB 1)
18031010018 - BAB 1.pdf Download (966kB) |
|
Text (BAB 2)
18031010018 - BAB 2.pdf Restricted to Repository staff only until 16 January 2028. Download (719kB) | Request a copy |
|
Text (BAB 3)
18031010018 - BAB 3.pdf Restricted to Repository staff only until 16 January 2028. Download (494kB) | Request a copy |
|
Text (BAB 4)
18031010018 - BAB 4.pdf Restricted to Repository staff only until 16 January 2028. Download (605kB) | Request a copy |
|
Text (BAB 5)
18031010018 - BAB 5.pdf Restricted to Repository staff only until 16 January 2028. Download (713kB) | Request a copy |
|
Text (BAB 6)
18031010018 - BAB 6.pdf Restricted to Repository staff only until 16 January 2028. Download (583kB) | Request a copy |
|
Text (BAB 7)
18031010018 - BAB 7.pdf Restricted to Repository staff only until 16 January 2028. Download (1MB) | Request a copy |
|
Text (BAB 8)
18031010018 - BAB 8.pdf Restricted to Repository staff only until 16 January 2028. Download (702kB) | Request a copy |
|
Text (BAB 9)
18031010018 - BAB 9.pdf Restricted to Repository staff only until 16 January 2028. Download (586kB) | Request a copy |
|
Text (BAB 10)
18031010018 - BAB 10.pdf Restricted to Repository staff only until 16 January 2028. Download (2MB) | Request a copy |
|
Text (BAB 11)
18031010018 - BAB 11.pdf Restricted to Repository staff only until 16 January 2028. Download (525kB) | Request a copy |
|
Text (DAFTAR PUSTAKA)
18031010018 - DAFTAR PUSTAKA.pdf Download (382kB) |
|
Text (APPENDIX)
18031010018 - APPENDIX.pdf Restricted to Repository staff only until 16 January 2028. Download (4MB) | Request a copy |
|
Text (FLOWSHEET)
18031010018 - FLOWSHEET.pdf Restricted to Repository staff only until 16 January 2028. Download (711kB) | Request a copy |
Abstract
Pra Rencana Pabrik Sodium Tripolyphosphate akan didirikan di daerah Kawasan Industri Djenu, Kabupaten Tuban. Jawa timur dengan pertimbangan lokasi pabrik yang strategis berpengaruh terhadap kelangsungan dan keberhasilan produksi. Dari hasil perhitungan dan pembahasan dapat disimpulkan sebagai berikut: 1. Kapasitas produksi : 65.000 ton/tahun 2. Bahan yang digunakan : Asam Phosphate, Sodium Carbonate 3. Sistem operasi : Continue 4. Waktu operasi : 330 hari/tahun, 24 jam/hari 5. Jumlah karyawan : 157 Orang 6. Bentuk perusahaan : Perseroan Terbatas (PT) 7. Struktur organisasi : Garis dan Staff Analisa ekonomi 1. Masa konstruksi : 2 tahun 2. Umur Pabrik : 10 tahun 3. Modal Tetap (FCI) : Rp. 238.364.086.266 4. Modal Kerja (WCI) : Rp. 326.147.343.999 5. Investasi Total (TCI) : Rp. 564.511.430.264 6. Bunga Bank : 9,95% / tahun 7. Return on Investment (ROI) : 43% (sebelum pajak) dan 32,4% (setelah pajak) 8. Internal of Return (IRR) : 29,4% 9. Waktu pengembalian Modal (PBP) : 3 tahun 4 bulan 10. Break Even Point (BEP) : 31,12%
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TP Chemical technology > TP155 Chemical engineering | ||||||||
Divisions: | Faculty of Engineering > Departement of Chemical Engineering | ||||||||
Depositing User: | Meldi Ramahdani Intan Pertiwi | ||||||||
Date Deposited: | 16 Jan 2025 08:47 | ||||||||
Last Modified: | 17 Jan 2025 02:19 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/33959 |
Actions (login required)
View Item |