Analisis Pengadaan dan Pengendalian Persediaan Bahan Baku Tebu di PT. Pabrik Gula Candi Baru Sidoarjo

Renata, Erika Aprilia (2024) Analisis Pengadaan dan Pengendalian Persediaan Bahan Baku Tebu di PT. Pabrik Gula Candi Baru Sidoarjo. Undergraduate thesis, UPN Veteran Jawa Timur.

[img] Text (COVER)
20024010107.-cover.pdf

Download (1MB)
[img] Text (BAB I)
20024010107.-bab1.pdf

Download (134kB)
[img] Text (BAB II)
20024010107.-bab2.pdf
Restricted to Registered users only until 20 September 2026.

Download (298kB)
[img] Text (BAB III)
20024010107.-bab3.pdf
Restricted to Registered users only until 20 September 2026.

Download (97kB)
[img] Text (BAB IV)
20024010107.-bab4.pdf
Restricted to Registered users only until 20 September 2026.

Download (749kB)
[img] Text (BAB V)
20024010107.-bab5.pdf

Download (11kB)
[img] Text (DAFTAR PUSTAKA)
20024010107.-daftarpustaka.pdf

Download (152kB)
[img] Text (LAMPIRAN)
20024010107.lampiran.pdf
Restricted to Registered users only until 20 September 2026.

Download (754kB)

Abstract

The supply of sugar cane raw materials in sugar factories must be maintained at the right level so that there are no shortages or excesses, so that the production process can run smoothly. This research aims to describe the mechanism for procurement and control of supplies of sugarcane raw materials at PT. PG Candi Baru Sidoarjo, analyzed trends in the procurement of sugar cane raw materials at PT. PG Candi Baru, as well as to analyze the control of sugarcane raw material supplies at PT. PG Candi Baru Sidoarjo. Data analysis used descriptive analysis, trend analysis, and Economic Order Quantity (EOQ) analysis. The results of this research were the mechanism for procurement and control of supplies of sugarcane raw materials by PT. PG Candi Baru. The trend for sugarcane raw materials has decreased each period which is caused by several factors. The number of economic sugar cane orders in the last year 2023 was 1,491,545,174 tons. The amount of safety stock that must be owned by PT. PG Candi Baru Sidoarjo is 234,044.8 tons. The number Reorder Point was 505,761 tons. The optimal total cost of supplying sugarcane raw materials was IDR 20,885,934,920.1442, whereas with the company's policy it is IDR 20,998,060,000. So it can be concluded that the EOQ method obtained more efficient results with a difference value of IDR 112,125,079,8578.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSoedarto, TeguhNIDN0720065601teguh_soedarto@upnjatim.ac.id
Thesis advisorWidayanti, SriNIDN0006016208sriwidayanti@upnjatim.ac.id
Subjects: S Agriculture > S Agriculture (General)
Divisions: Faculty of Agriculture > Departement of Agribusiness
Depositing User: erika aprilia renata
Date Deposited: 23 Sep 2024 02:54
Last Modified: 23 Sep 2024 02:54
URI: https://repository.upnjatim.ac.id/id/eprint/29649

Actions (login required)

View Item View Item