METODE PELAKSANAAN PEKERJAAN TIANG BOR PADA KONSTRUKSI BAWAH JEMBATAN BH - 122 PROYEK JALUR GANDA JALAN KA LINTAS SELATAN JAWA KM 35+000 S.D KM 37+800 ANTARA MOJOKERTO– SEPANJANG LINTAS SURABAYA–SOLO (PAKET JGMS_5/2021)

Meidianto, Raynaldi and Prawira, Kevin METODE PELAKSANAAN PEKERJAAN TIANG BOR PADA KONSTRUKSI BAWAH JEMBATAN BH - 122 PROYEK JALUR GANDA JALAN KA LINTAS SELATAN JAWA KM 35+000 S.D KM 37+800 ANTARA MOJOKERTO– SEPANJANG LINTAS SURABAYA–SOLO (PAKET JGMS_5/2021). Project Report (Praktek Kerja Lapang). UPN VETERAN JAWA TIMUR. (Unpublished)

[img] Text (COVER)
Cover KP.pdf

Download (1MB)
[img] Text (BAB I)
BAB 1.pdf

Download (231kB)
[img] Text (BAB II)
BAB 2.pdf
Restricted to Registered users only until 18 July 2026.

Download (459kB)
[img] Text (BAB III)
BAB 3.pdf
Restricted to Registered users only until 18 July 2026.

Download (183kB)
[img] Text (BAB IV)
BAB 4.pdf
Restricted to Registered users only until 18 July 2026.

Download (2MB)
[img] Text (BAB V)
BAB 5.pdf
Restricted to Registered users only until 18 July 2026.

Download (579kB)
[img] Text (BAB VI)
BAB 6.pdf

Download (128kB)
[img] Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf

Download (10kB)
[img] Text (LAMPIRAN)
LAMPIRAN.pdf
Restricted to Registered users only until 18 July 2026.

Download (5MB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSumaidi, Sumaidi0707097901sumaidi.ts@upnjatim.ac.id
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering > Departement of Civil Engineering
Depositing User: Raynaldi Meidianto
Date Deposited: 14 Mar 2025 07:24
Last Modified: 14 Mar 2025 07:24
URI: https://repository.upnjatim.ac.id/id/eprint/26596

Actions (login required)

View Item View Item