SALSABILA, IVONNE RAKHA (2021) ANALISIS PENERAPAN KONSEP LEAN MANUFACTURING PADA PROSES PRODUKSI STAINLESS STEEL COIL UNTUK MEREDUKSI PEMBOROSAN (WASTE) DI PT. IMR ARC STEEL. Undergraduate thesis, UPN Veteran Jawa Timur.
|
Text (Cover)
cvr.pdf Download (1MB) | Preview |
|
|
Text (Bab 1)
b1.pdf Download (98kB) | Preview |
|
Text (Bab 2)
b2.pdf Restricted to Registered users only Download (704kB) |
||
Text (Bab 3)
b3.pdf Restricted to Registered users only Download (123kB) |
||
Text (Bab 4)
b4.pdf Restricted to Registered users only Download (735kB) |
||
|
Text (Bab 5)
b5.pdf Download (27kB) | Preview |
|
|
Text (Daftar pustaka)
dapus.pdf Download (146kB) | Preview |
|
Text (Lampiran)
lamp.pdf Restricted to Registered users only Download (533kB) |
Abstract
PT. IMR Arc Steel is a manufacturing company engaged in the production of Stainless Steel Coil. PT. IMR Arc Steel needs to continuously improve firm performance to improve its product quality. The objective of this study is to identify, reduce, and propose improvements to waste in the Stainless Steel Coil production process. The method used was the lean manufacturing concept with value stream mapping tools and the help of the Failure Mode and Effect Analysis (FMEA) method. Based on the results of the study on the value stream mapping, it was found that the time reduction was from 461 minutes to 416 minutes. Based on the Failure Mode and Effect Analysis (FMEA), recommendations for improvements that can be proposed are to calibrate and control the temperature until it reaches the hot bucket temperature standard that is most suitable and stable, enter the scraph along with the hot bucket heating set up, eliminate the activity of iron ore tube loading and topedo bucket loading, and setting up hot roller mill heating before the bil lets arrive and by minimizing errors in each section and optimizing the process in each section according to the Standard Operating Procedure (SOP) set by the company. Keywords: Failure Mode and Effect Analysis, Lean Manufacturing, Process Activity Model.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Fatchullah Fatchullah | ||||||||
Date Deposited: | 27 Jul 2021 03:57 | ||||||||
Last Modified: | 27 Jul 2021 03:57 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/2346 |
Actions (login required)
View Item |