Andira, Ayu (2023) LAPORAN PRAKTIK KERJA LAPANGAN PT. SEMEN INDONESIA (PERSERO) Tbk. PABRIK TUBAN. Project Report (Praktek Kerja Lapang). Universitas Pembangunan Nasional "Veteran" Jawa Timur, Surabaya. (Unpublished)
Text (COVER)
19031010184.-COVER .pdf Download (3MB) |
|
Text (BAB 1)
19031010184.-BAB 1.pdf Download (13MB) |
|
Text (BAB 2)
19031010184.-BAB 2.pdf Download (582kB) |
|
Text (BAB 3)
19031010184.-BAB 3.pdf Restricted to Registered users only until 18 April 2027. Download (4MB) |
|
Text (BAB 4)
19031010184.-BAB 4.pdf Restricted to Registered users only until 18 April 2027. Download (2MB) |
|
Text (BAB 5)
19031010184.-BAB 5.pdf Restricted to Registered users only until 18 April 2027. Download (485kB) |
|
Text (BAB 6-8)
19031010184.-BAB 6-8.pdf Restricted to Registered users only until 18 April 2027. Download (1MB) |
|
Text (BAB 9-10)
19031010184.-BAB 9-10.pdf Download (1MB) |
|
Text (DAFTAR PUSTAKA)
19031010184.-DAFTAR PUSTAKA.pdf Download (434kB) |
Abstract
PT. Semen Indonesia (Persero) Tbk Tuban Factory is located approximately 24 km from Tuban city, precisely in Sumberarum Village, Kerek District, Tuban Regency. Based on the main raw materials, namely clay and limestone, which are abundant and of good quality, thus supporting the quality of cement production to meet Indonesian Industrial Standards (SII/SNI). The process used is a dry process. At PT. Semen Indonesia (Persero) Tbk in making cement there are 5 process stages, namely the raw material preparation process, raw material grinding process, combustion process, slag grinding process, and packaging. The production support and quality control units include emission control, process control, process evaluation, and quality assurance, utility operations. During the implementation of this special task, the aim of this special task is to calculate the incoming and outgoing mass balance to determine the mass balance of each tool in the RKC 2 Kiln System. The benefit of this special task is to find out if there is a possibility that the performance of each tool will decrease, resulting in mass loss. For this reason, it needs to be maintained by analyzing and calculating the mass flow in the RKC 2 Kiln System.
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TP Chemical technology T Technology > TP Chemical technology > TP155 Chemical engineering |
||||||||
Divisions: | Faculty of Engineering > Departement of Chemical Engineering | ||||||||
Depositing User: | Ayu andira | ||||||||
Date Deposited: | 21 May 2024 03:34 | ||||||||
Last Modified: | 21 May 2024 03:34 | ||||||||
URI: | https://repository.upnjatim.ac.id/id/eprint/21799 |
Actions (login required)
View Item |