PABRIK CARBON DARI PALM KERNEL SHELL DENGAN PROSES ACTIVATION

Anam, Irza (2024) PABRIK CARBON DARI PALM KERNEL SHELL DENGAN PROSES ACTIVATION. Undergraduate thesis, UPN Veteran Jawa Timur.

[img]
Preview
Text (cover)
kop-bab 1.pdf

Download (1MB) | Preview
[img]
Preview
Text (bab 1)
BAB 01.pdf

Download (191kB) | Preview
[img] Text (bab 2)
BAB 02.pdf
Restricted to Repository staff only until 10 January 2027.

Download (170kB)
[img] Text (bab 3)
BAB 03.pdf
Restricted to Repository staff only until 10 January 2027.

Download (114kB)
[img] Text (bab 4)
BAB 04.pdf
Restricted to Repository staff only until 10 January 2027.

Download (165kB)
[img]
Preview
Text (bab 5)
BAB 05 rev 10 1.pdf

Download (601kB) | Preview
[img] Text (Bab 6)
BAB 06.pdf
Restricted to Repository staff only until 10 January 2027.

Download (232kB)
[img] Text (Bab 7)
BAB 07 fix.pdf
Restricted to Repository staff only until 10 January 2027.

Download (658kB)
[img] Text (Bab 8)
BAB 08.pdf
Restricted to Repository staff only until 10 January 2027.

Download (348kB)
[img] Text (Bab 9)
BAB 09.pdf
Restricted to Repository staff only until 10 January 2027.

Download (255kB)
[img] Text (Bab 10)
BAB 10 rev 10 1.pdf
Restricted to Repository staff only until 10 January 2027.

Download (155kB)
[img] Text (Bab 11)
BAB 11 fix.pdf
Restricted to Repository staff only until 10 January 2027.

Download (107kB)
[img]
Preview
Text (daftar pustaka)
dafpus fix.pdf

Download (361kB) | Preview
[img] Text (Lampiran)
lampiran (2).pdf
Restricted to Repository staff only until 10 January 2027.

Download (1MB)

Abstract

Pre Plan of Activated Carbon Factory from Palm Kernel Shell with Process This Thermal Activation is planned to be produced with a capacity of 32,000 tons/year in powder form with a size of 325 mesh. Carbon factory Active is expected to be able to meet domestic needs in the country where it is used from year to year it increases quite a bit, whether it is successful or not depends not only on modern processes and equipment or good quality products rather lies in the appropriate and appropriate system and method of handling, both regarding process, production, management and marketing techniques. This factory is planned to be established in Muaro Jambi Regency, Jambi. The location of this factory is close to the toll road. Road large trucks and trailers can pass.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorBillah, MutasimNIDN0704056001UNSPECIFIED
Subjects: Q Science > QD Chemistry
Divisions: Faculty of Engineering > Departement of Chemical Engineering
Depositing User: Irza Anam Icho
Date Deposited: 12 Jan 2024 03:38
Last Modified: 12 Jan 2024 03:38
URI: http://repository.upnjatim.ac.id/id/eprint/19714

Actions (login required)

View Item View Item