Pratiwi, Adinda Laksmi (2023) Analisis Pemborosan pada Proses Aliran Pergudangan dengan Metode Lean Warehousing (Studi Kasus: Pergudangan PT. FLSmidth Indonesia). Undergraduate thesis, UPN Veteran Jawa Timur.
|
Text (Cover)
19032010086-cover.pdf Download (733kB) | Preview |
|
|
Text (BAB I)
19032010086-bab1.pdf Download (177kB) | Preview |
|
Text (BAB II)
19032010086-bab2.pdf Restricted to Repository staff only until 29 December 2025. Download (857kB) |
||
Text (BAB III)
19032010086-bab3.pdf Restricted to Repository staff only until 29 December 2025. Download (75kB) |
||
Text (BAB IV)
19032010086-bab4.pdf Restricted to Repository staff only until 29 December 2025. Download (700kB) |
||
|
Text (BAB V)
19032010086-bab5.pdf Download (29kB) | Preview |
|
|
Text (Daftar pustaka)
19032010086-daftar pustaka.pdf Download (98kB) | Preview |
|
Text (LAMPIRAN)
19032010086-lampiran.pdf Restricted to Repository staff only until 29 December 2025. Download (852kB) |
Abstract
FLSmidth & Co. is one of the Danish construction companies that provides plant, machinery, services, and knowledge for the mining and mineral industry. PT FLSmidth Indonesia focuses more on providing services, machinery, and materials or spare parts for processing in mining and mineral companies. At PT. FLSmidth Indonesia, there are still various wasteful activities in the spare-part warehousing flow process. This research was conducted with the aim of knowing the kinds of waste that occur and the proposed improvements that can be given. The analysis in this research uses lean warehousing method which consists of Waste Assessment Model (WAM), Value Stream Mapping (VSM), Value Stream Analysis Tools (VALSAT), and Fishbone Diagram. This research provides the results of the total percentage of necessary non-value added and non-value added activities is 50% or equivalent to the percentage of value added activities, as well as a total lead time of 7748 minutes. After analyzing improvements using Process Activity Mapping (PAM) and fishbone diagrams, it was found that the percentage of value-added activities increased to 56% and the total lead time changed to 7648 minutes. Keywords: Fishbone Diagram, Process Activity Mapping, Value Stream Mapping, Waste Assessment Model
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering |
||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Adinda Laksmi Pratiwi | ||||||||
Date Deposited: | 29 Dec 2023 03:06 | ||||||||
Last Modified: | 29 Dec 2023 03:06 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/19182 |
Actions (login required)
View Item |