Taufiq, Muhammad (2023) Analisa Penjadwalan Produksi Dengan Metode Campbell Dudek Smith Dan Palmer Untuk Meminimasi Makespan di CV Maju Makmur Bersama. Undergraduate thesis, UPN Veteran Jawa Timur.
|
Text
19032010078-cover.pdf Download (2MB) | Preview |
|
|
Text (Bab 1)
19032010078-bab 1.pdf Download (234kB) | Preview |
|
Text (Bab 2)
19032010078-bab 2.pdf Restricted to Registered users only until 28 December 2025. Download (458kB) | Request a copy |
||
Text (Bab 3)
19032010078-bab 3.pdf Restricted to Registered users only until 28 December 2025. Download (359kB) | Request a copy |
||
Text (Bab 4)
19032010078-bab 4.pdf Restricted to Registered users only until 28 December 2025. Download (614kB) | Request a copy |
||
|
Text (Bab 5)
19032010078-bab 5.pdf Download (218kB) | Preview |
|
|
Text (Daftar Pustaka)
19032010078-daftarpustaka.pdf Download (170kB) | Preview |
|
Text (Lampiran)
19032010078-lampiran.pdf Restricted to Registered users only until 28 December 2025. Download (974kB) | Request a copy |
Abstract
CV Maju Makmur Bersama is a manufacturing company in the stainless steel hardware sector that specializes in hardware and detailing. This company actively produces for the needs of individual consumers and orders from other companies. One of the problems faced by CV Maju Makmur Bersama is the use of production machines that are less than optimal at every stage of the production process. Production machine performance that is not optimal can increase the total value of production time (makespan), which in turn can cause delays in completing products and delivery to consumers. This research aims to find the minimum total production time value by applying the Campbell Dudek Smith and Palmer method in production scheduling. The calculation results show that by applying the First Come First Serve (FCFS) production scheduling method, the company obtained a makespan of 39.65 hours. However, by using the proposed method, namely Campbell Dudek Smith (CDS) in production scheduling, the results of the makespan calculation show a figure of 33.52 hours. Meanwhile, the results of production scheduling calculations using the Palmer method obtained a makespan value of 41.45 hours. A comparison of the three methods shows that the proposed scheduling using the Campbell Dudek Smith method has a lower makespan value compared to the company method (FCFS), resulting in a time savings of 6.13 hours, or the equivalent of 15.46%.
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering T Technology > TS Manufactures T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management |
||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Muhammad Taufiq | ||||||||
Date Deposited: | 29 Dec 2023 06:45 | ||||||||
Last Modified: | 29 Dec 2023 06:45 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/19167 |
Actions (login required)
View Item |