SISTEM PRODUKSI DAN PENGENDALIAN PERSEDIAAN BAHAN BAKU SILICA SAND DENGAN METODE ECONOMIC ORDER QUANTITY (EOQ) DI PT. ASAHIMAS FLAT GLASS TBK SIDOARJO FACTORY

Marbun, Chandra Ericson (2023) SISTEM PRODUKSI DAN PENGENDALIAN PERSEDIAAN BAHAN BAKU SILICA SAND DENGAN METODE ECONOMIC ORDER QUANTITY (EOQ) DI PT. ASAHIMAS FLAT GLASS TBK SIDOARJO FACTORY. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)

[img]
Preview
Text (COVER)
19032010075 - Cover.pdf

Download (838kB) | Preview
[img]
Preview
Text (BAB 1)
19032010075 - Bab 1.pdf

Download (166kB) | Preview
[img]
Preview
Text (BAB 2)
19032010075 - Bab 2.pdf

Download (253kB) | Preview
[img] Text (BAB 3)
19032010075 - Bab 3.pdf
Restricted to Registered users only until 11 September 2025.

Download (589kB)
[img] Text (BAB 4)
19032010075 - Bab 4.pdf
Restricted to Registered users only until 11 September 2025.

Download (468kB)
[img] Text (BAB 5)
19032010075 - Bab 5.pdf
Restricted to Registered users only until 11 September 2025.

Download (258kB)
[img]
Preview
Text (BAB 6)
19032010075 - Bab 6.pdf

Download (142kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
19032010075 - Dafpus.pdf

Download (136kB) | Preview
[img] Text (LAMPIRAN)
19032010075 - Lampiran.pdf
Restricted to Registered users only until 11 September 2025.

Download (1MB)
Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorWidjajati, Endang PudjiNIDN0728126002endangp.ti@upnjatim.ac.id
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Chandra Ericson Marbun
Date Deposited: 12 Sep 2023 08:22
Last Modified: 06 Nov 2023 08:01
URI: http://repository.upnjatim.ac.id/id/eprint/17248

Actions (login required)

View Item View Item