Sugiarto, Timothy Anugrah SISTEM PRODUKSI DAN OPTIMASI PRODUKTIVITAS PEKERJA PADA IDLE TIME DI STASIUN SODA ASH DENGAN METODE WORK SAMPLING DI PT ASAHIMAS FLAT GLASS Tbk. SIDOARJO FACTORY. Project Report (Praktek Kerja Lapang). Timothy Anugrah Sugiarto. (Unpublished)
|
Text (COVER)
1. COVER.pdf Download (3MB) | Preview |
|
|
Text (BAB 1)
2. BAB 1.pdf Download (144kB) | Preview |
|
|
Text (BAB 2)
3. BAB 2.pdf Download (8MB) | Preview |
|
Text (BAB 3)
4. BAB 3.pdf Restricted to Registered users only until 24 July 2025. Download (8MB) |
||
Text (BAB 4)
BAB 4 5 .pdf Restricted to Registered users only until 24 July 2025. Download (1MB) |
||
|
Text (BAB 5)
7. BAB 6.pdf Download (8MB) | Preview |
Abstract
The Print Head requires maintenance every 4332.92 hours or 181 days with a scheduled restoration task. The Carriage Belt needs maintenance every 1776.03 hours or 74 days with a scheduled discard task. The Encoder Strip requires maintenance every 2591.58 hours or 108 days with a scheduled discard task. The Power Supply needs maintenance every 2494.44 hours or 104 days with a scheduled restoration task. Lastly, the Sensor needs maintenance every 2535.84 hours or 106 days with a scheduled restoration task. These calculations will assist the company in scheduling appropriate maintenance for each component to improve efficiency and prevent unwanted machine failures.
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TS Manufactures | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | timothy anugrah | ||||||||
Date Deposited: | 25 Jul 2023 04:40 | ||||||||
Last Modified: | 25 Jul 2023 04:40 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/16235 |
Actions (login required)
View Item |