Metode Pelaksanaan Pekerjaan Kolom Dan Pelat Level Koridor Gedung C Lapangan Tembak Kedung Cowek Surabaya

Herdirinanda, Arga Erditya and Sahid, Argo Nur (2023) Metode Pelaksanaan Pekerjaan Kolom Dan Pelat Level Koridor Gedung C Lapangan Tembak Kedung Cowek Surabaya. Project Report (Praktek Kerja Lapang). UNIVERSITAS PEMBANGUNAN NASIONAL "VETERAN" JAWA TIMUR.

[img]
Preview
Text (Cover)
17035010044-17035010063-cover.pdf

Download (995kB) | Preview
[img]
Preview
Text (Bab 1)
17035010044-17035010063-bab1.pdf

Download (196kB) | Preview
[img]
Preview
Text (Bab 2)
17035010044-17035010063-bab2.pdf

Download (347kB) | Preview
[img] Text (Bab 3)
17035010044-17035010063-bab3.pdf
Restricted to Registered users only until 24 July 2026.

Download (153kB)
[img] Text (Bab 4)
17035010044-17035010063-bab4.pdf
Restricted to Registered users only until 24 July 2026.

Download (506kB)
[img] Text (Bab 5)
17035010044-17035010063-bab5.pdf
Restricted to Registered users only until 24 July 2026.

Download (54kB)
[img]
Preview
Text (Daftar pustaka)
17035010044-17035010063-daftarpustaka.pdf

Download (52kB) | Preview
Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorPutra, I Nyoman Dita PahangNIDN0717037003UNSPECIFIED
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: Faculty of Engineering > Departement of Civil Engineering
Depositing User: arga erditya herdirinanda
Date Deposited: 25 Jul 2023 01:26
Last Modified: 25 Jul 2023 01:26
URI: http://repository.upnjatim.ac.id/id/eprint/16209

Actions (login required)

View Item View Item