Susanti, Novia Dwi SISTEM PRODUKSI DAN ANALISA PRODUKTIVITAS PEKERJA DI STASIUN PERAKITAN (ASSEMBLING) DENGAN METODE TIME STUDY PADA PT. PRIMA DINAMIKA SENTOSA. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)
|
Text (Cover)
19032010038_Cover.pdf Download (2MB) | Preview |
|
|
Text (Bab 1)
19032010038_Bab_1.pdf Download (1MB) | Preview |
|
Text (Bab 2)
19032010038_Bab_2.pdf Restricted to Registered users only until 15 January 2024. Download (10MB) |
||
Text (Bab 3)
19032010038_Bab_3.pdf Restricted to Registered users only until 15 January 2024. Download (5MB) |
||
Text (Bab 4)
19032010038_Bab_4.pdf Restricted to Registered users only until 15 January 2024. Download (3MB) |
||
Text (Bab 5)
19032010038_Bab_5.pdf Restricted to Registered users only until 15 January 2024. Download (756kB) |
||
Text (Bab 6)
19032010038_Bab_6.pdf Restricted to Registered users only until 15 January 2024. Download (1MB) |
||
|
Text (Daftar Pustaka)
19032010038_Daftar_isi.pdf Download (1MB) | Preview |
|
Text (Lampiran)
19032010038_Lampiran.pdf Restricted to Registered users only until 15 January 2024. Download (7MB) |
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TS Manufactures T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management |
||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Novia Dwi Susanti | ||||||||
Date Deposited: | 21 Jul 2023 08:53 | ||||||||
Last Modified: | 21 Jul 2023 08:53 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/15849 |
Actions (login required)
View Item |