Novianti, Fenny (2023) SISTEM PRODUKSI DAN ANALISIS K3 DENGAN METODE HAZARD IDENTIFICATION RISK ASSESSMENT AND RISK CONTROL (HIRARC) DI PT. J RESOURCES BOLAANG MONGONDOW. Project Report (Praktek Kerja Lapang). Universitas Pembangunan Nasional Veteran Jawa Timur. (Unpublished)
|
Text (Cover)
19032010127_COVER .pdf Download (2MB) | Preview |
|
|
Text (Bab I)
19032010127_BAB I.pdf Download (242kB) | Preview |
|
Text (Bab II)
19032010127_BAB II.pdf Restricted to Registered users only Download (507kB) |
||
Text (Bab III)
19032010127_BAB III.pdf Restricted to Registered users only until 21 July 2025. Download (1MB) |
||
Text (Bab IV)
19032010127_BAB IV.pdf Restricted to Registered users only until 21 July 2025. Download (598kB) |
||
|
Text (Bab V)
19032010127_BAB V.pdf Download (123kB) | Preview |
|
|
Text (Daftar Pustaka)
19032010127_DAFTAR PUSTAKA.pdf Download (216kB) | Preview |
|
Text (Lampiran)
19032010127_LAMPIRAN.pdf Restricted to Repository staff only until 21 July 2025. Download (1MB) |
Abstract
The raw materials used in the gold production system at PT. J Resources Bolaang Mongondow is divided into two materials, namely the main raw materials and supporting raw materials. main raw materials and supporting raw materials. The main raw material used in the J Resources Bolaang Mongondow production system is gold ore . While the supporting raw materials used as raw materials production raw materials include sodium cyanide and lime.
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Fenny Novianti | ||||||||
Date Deposited: | 21 Jul 2023 07:14 | ||||||||
Last Modified: | 22 Dec 2023 01:03 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/15800 |
Actions (login required)
View Item |