Pengukuran Kinerja Supply Chain Management (SCM) Menggunakan Metode Supply Chain Operation Reference (SCOR) Pada PT Petrokimia Gresik

Hidayati, Alfi (2023) Pengukuran Kinerja Supply Chain Management (SCM) Menggunakan Metode Supply Chain Operation Reference (SCOR) Pada PT Petrokimia Gresik. Undergraduate thesis, UPN Veteran Jawa Timur.

[img]
Preview
Text (Cover)
Cover.pdf

Download (2MB) | Preview
[img]
Preview
Text (Bab 1)
Bab 1.pdf

Download (63kB) | Preview
[img]
Preview
Text (Bab 2)
Bab 2.pdf

Download (352kB) | Preview
[img] Text (Bab 3)
Bab 3.pdf
Restricted to Registered users only until 2025.

Download (292kB)
[img] Text (Bab 4)
Bab 4.pdf
Restricted to Registered users only until 2025.

Download (589kB)
[img]
Preview
Text (Bab 5)
Bab 5.pdf

Download (31kB) | Preview
[img]
Preview
Text (Daftar pustaka)
Daftar pustaka.pdf

Download (161kB) | Preview
[img] Text (Lampiran)
Lampiran.pdf
Restricted to Registered users only until 2025.

Download (2MB)

Abstract

In the world of the fertilizer industry in Indonesia there are a number of problems in the process of planning, procurement and delivery of materials that adversely affect the company's operations. One approach to fixing this problem is to use a SCOR strategy that is effective in improving the supply chain. PT Petrokimia Gresik is one of the fertilizer companies whose current condition is that there are problems in planning to meet the needs for production supporting materials, so that it has the potential to hinder fertilizer production. This is because PT Petrokimia Gresik has not carried out an analysis that hinders demand planning or supply chain as a whole. Thus, researchers can measure the value of effectiveness in the supply chain to improve targets that have not been achieved. In this research, a scoring method called SCOR was used which included AHP weighting. Fifteen key performance indicators (KPI) were generated based on the five SCOR model indicators used in processing, namely data plan, source, make, delivery, and return. With a final score of the SCM performance level of 86.872, which is included in the Good category. However, this value can still be improved so that it is included in the excellent category, namely >90. So inecessary to identify KPI indicators that have performance values that are not yet optimal, in order to make suggestions for improvements so as to increase PT Petrokimia Gresik SCM performance values. Keywords : Supply Chain Management, SCOR, KPI, AHP

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
UNSPECIFIEDPulansari, Farida197902032021212007UNSPECIFIED
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD38.5 Supply Chain Management
Divisions: Faculty of Engineering > Departement of Industrial Engineering
Depositing User: Alfi Hidayati Alfi
Date Deposited: 20 Jul 2023 09:48
Last Modified: 20 Jul 2023 09:48
URI: http://repository.upnjatim.ac.id/id/eprint/15642

Actions (login required)

View Item View Item