Christanto, Mas Ngabei David Johan Bagus Cahyo Christanto (2023) Metode Pelaksanaan Konstruksi Kolom PB 2A Pada Proyek Jalan Lingkar Luar Barat (JLLB) Tahap 2. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)
|
Text (Cover)
17035010061.-cover.pdf.pdf Download (744kB) | Preview |
|
|
Text (BAB 1)
17035010061.-bab1.pdf.pdf Download (74kB) | Preview |
|
Text (BAB 2)
17035010061.-bab2.pdf.pdf Restricted to Registered users only until 10 May 2025. Download (876kB) |
||
Text (BAB 3)
17035010061.-bab3.pdf.pdf Restricted to Registered users only until 10 May 2025. Download (1MB) |
||
Text (BAB 4)
17035010061.-bab4.pdf.pdf Restricted to Registered users only until 10 May 2025. Download (628kB) |
||
|
Text (BAB 5)
17035010061.-bab5.pdf.pdf Download (14kB) | Preview |
|
|
Text (Daftar pustaka)
17035010061.-daftarpustaka.pdf.pdf Download (129kB) | Preview |
|
Text (LAMPIRAN)
17035010061.-lampiran.pdf.pdf Restricted to Registered users only until 10 May 2025. Download (832kB) |
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||||
Depositing User: | David johan christanto | ||||||||
Date Deposited: | 12 May 2023 02:57 | ||||||||
Last Modified: | 12 May 2023 02:57 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/13216 |
Actions (login required)
View Item |