Tarigan, Garata Gema Putra (2023) Perencanaan Sarana Transportasi Massal LRT di Kota Medan (Studi Kasus Tanjung Selamat - Belawan). Undergraduate thesis, UPN VETERAN JAWA TIMUR.
|
Text (Cover)
17035010034.-cover.pdf Download (1MB) | Preview |
|
|
Text (Bab 1)
17035010034.-bab1.pdf.pdf Download (170kB) | Preview |
|
Text (Bab 2)
17035010034.-bab2.pdf.pdf Restricted to Registered users only until 13 April 2025. Download (144kB) |
||
Text (Bab 3)
17035010034.-bab3.pdf.pdf Restricted to Registered users only until 13 April 2025. Download (129kB) |
||
Text (Bab 4)
17035010034.-bab4.pdf.pdf Restricted to Registered users only until 13 April 2025. Download (672kB) |
||
|
Text (Bab 5)
17035010034.-bab5.pdf.pdf Download (77kB) | Preview |
|
|
Text (Daftar Pustaka)
17035010034.-daftarpustaka.pdf.pdf Download (79kB) | Preview |
|
Text (Lampiran)
17035010034.-lampiran.pdf.pdf Restricted to Registered users only until 13 April 2025. Download (358kB) |
Abstract
Existing mode of transportation that have been operating in the City of Medan are local city transport, pedicab. Those existing transportation mode not entirely enough to meet people’s requisite on public transportation caused of several factor such as number of vehicle no longer effective compared to avaliable section road, and public transportation service quality. LRT as new mode of mass transportation mode is solution to reduce problems in public transportation in the City of Medan. In this planning using polynomial square regression method to plan the number of passengers in the next 5 years. The results of the polynomial square regression method are used to obtain the required number of units using the load factor, circulation time and headway formulas. The primary data that used is collected from questionnaire surveys. The secondary data used is the number of passengers who have taken the Angkutan Kota 130 in the last 5. The results of mass transport facilities LRT planning in Medan City are a planned headway of 114 minutes with a design load factor used of 0.7, circulation time of 292,5 minutes, the required number of units is 3 train sets, and the planned shelters totaling 17 shelters. .
Item Type: | Thesis (Undergraduate) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TF Railroad engineering and operation | ||||||||
Divisions: | Faculty of Engineering > Departement of Civil Engineering | ||||||||
Depositing User: | GARATA GEMA PUTRA TARIGAN | ||||||||
Date Deposited: | 13 Apr 2023 08:08 | ||||||||
Last Modified: | 13 Apr 2023 08:08 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/12948 |
Actions (login required)
View Item |