ANALISIS PEMASANGAN PILE CAP TERHADAP MUKA AIR TANAH PADA PROYEK PEMBANGUNAN APARTEMEN WESTOWN VIEW TOWER 1 LA CHIVA SURABAYA

Asih, Nur Sukma (2022) ANALISIS PEMASANGAN PILE CAP TERHADAP MUKA AIR TANAH PADA PROYEK PEMBANGUNAN APARTEMEN WESTOWN VIEW TOWER 1 LA CHIVA SURABAYA. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)

[img]
Preview
Text
18035010023-cover.pdf

Download (1MB) | Preview
[img]
Preview
Text
18035010023-bab1.pdf

Download (192kB) | Preview
[img] Text
18035010023-bab2.pdf
Restricted to Registered users only until 15 November 2024.

Download (274kB)
[img] Text
18035010023-bab3.pdf
Restricted to Registered users only until 15 November 2024.

Download (138kB)
[img] Text
18035010023-bab4.pdf
Restricted to Registered users only until 15 November 2024.

Download (852kB)
[img]
Preview
Text
18035010023-bab5.pdf

Download (359kB) | Preview
[img]
Preview
Text
18035010023-daftarpustaka.pdf

Download (94kB) | Preview
[img] Text
18035010023-lampiran.pdf
Restricted to Registered users only until 15 November 2024.

Download (6MB)

Abstract

Indonesia's population is growing rapidly. Growth it is these people who demand urban development to meet their needs the lives of its inhabitants. Rapid population growth makes land where the population is getting narrower so that very apartments are built effectively to occupy and meet the needs of life. The Koa Surabaya government is building an apartment in the Jl. Raya Menganti area Jl. Dukuh Karangan Tengah Swipe, Kec Wiyung, Surabaya. At this location, will built 5 towers. The tower currently under construction is Tower 1 (La Chiva) with 45 floors and 968 units. Construction of tower 1 (La Chiva) of 5 towers in the development project apartemnet westtown view surabaya implemented by PT. PPRO Sampurna Jaya which started in April 2019 and is scheduled to finish in October 2022 . Westtown View Apartment development project consists of a lower structure and superstructure. The bottom structure is the pile foundation, pile cap and sloof, while the upper structure consists of columns, beams, floor plates and roof. The depth of excavation at the pile cap causes the necessary discharge of groundwater handled before the casting stage is carried out on the pile cap so that ground water does not affect the cement water in the concrete mixture used to cast the pile stamp. Based on this background, the practical work implemented in the Westown View Surabaya Apartment Development Project the theme of the analysis of the installation of pile caps against the groundwater level is taken of metal work, installation of formwork and casting.

Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
UNSPECIFIEDWibisana, Hendrata0708126501hendrata2008@gmail.com
Subjects: H Social Sciences > HD Industries. Land use. Labor
Divisions: Faculty of Engineering > Departement of Civil Engineering
Depositing User: NUR SUKMA ASIH
Date Deposited: 15 Nov 2022 07:50
Last Modified: 15 Nov 2022 07:50
URI: http://repository.upnjatim.ac.id/id/eprint/10280

Actions (login required)

View Item View Item