PERHITUNGAN EVALUASI EFISIENSI FURNACE 2 (F-02) PADA UNIT KILANG di Pusat Pengembangan Sumber Daya Manusia Minyak dan Gas Bumi pada tanggal 01 Oktober 2021 s/d 29 Oktober 2021

Syaputra, Ian Yusuf (2022) PERHITUNGAN EVALUASI EFISIENSI FURNACE 2 (F-02) PADA UNIT KILANG di Pusat Pengembangan Sumber Daya Manusia Minyak dan Gas Bumi pada tanggal 01 Oktober 2021 s/d 29 Oktober 2021. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur. (Unpublished)

[img]
Preview
Text (COVER)
COVER.pdf

Download (1MB) | Preview
[img]
Preview
Text (BAB 1)
BAB 1.pdf

Download (741kB) | Preview
[img]
Preview
Text (BAB 2)
BAB 2.pdf

Download (633kB) | Preview
[img] Text (BAB 3)
BAB 3.pdf
Restricted to Registered users only until 15 November 2025.

Download (528kB)
[img] Text (BAB 4)
BAB 4.pdf
Restricted to Registered users only until 15 November 2025.

Download (359kB)
[img] Text (BAB 5)
BAB 5.pdf
Restricted to Registered users only until 15 November 2025.

Download (246kB)
[img] Text (BAB 6-8)
BAB 6-8.pdf
Restricted to Registered users only until 15 November 2025.

Download (328kB)
[img]
Preview
Text (BAB 9)
BAB 9.pdf

Download (166kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
DAFPUS.pdf

Download (155kB) | Preview
Item Type: Monograph (Project Report (Praktek Kerja Lapang))
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorSuprihatin, SuprihatinNIDN0708056303UNSPECIFIED
Subjects: T Technology > TP Chemical technology > TP155 Chemical engineering
Divisions: Faculty of Engineering > Departement of Chemical Engineering
Depositing User: IAN YUSUF SYAPUTRA
Date Deposited: 15 Nov 2022 08:02
Last Modified: 15 Nov 2022 08:02
URI: http://repository.upnjatim.ac.id/id/eprint/10276

Actions (login required)

View Item View Item