Pengembangan TPS Kelurahan Bringin Berbasis 3R Kecamatan Sambikerep Kota Surabaya

Hapsari, Dian Retno (2022) Pengembangan TPS Kelurahan Bringin Berbasis 3R Kecamatan Sambikerep Kota Surabaya. Undergraduate thesis, UPN Veteran Jawa Timur.

[img]
Preview
Text (Cover)
Cover.pdf

Download (2MB) | Preview
[img]
Preview
Text (Bab 1)
18034010007.-bab1.pdf

Download (336kB) | Preview
[img] Text (Bab 2)
18034010007.-bab2.pdf
Restricted to Registered users only until 14 November 2024.

Download (1MB)
[img] Text (Bab 3)
18034010007.-bab3.pdf
Restricted to Registered users only until 14 November 2024.

Download (693kB)
[img] Text (Bab 4)
18034010007.-bab4.pdf
Restricted to Registered users only until 14 November 2024.

Download (1MB)
[img]
Preview
Text (Bab 5)
18034010007.-bab5.pdf

Download (331kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
18034010007.-daftarpustaka.pdf

Download (543kB) | Preview
[img] Text (Lampiran)
18034010007.-lampiran.pdf
Restricted to Registered users only until 14 November 2024.

Download (6MB)

Abstract

Waste management in TPS Bringin Village which serves 5483 people is not in good operation. One approach that can be dealing the problem to reduce the waste is the 3R method of waste management. The calculation method used in this planning refers to SNI 19-3964-1994. Based on the waste sampling that has been carried out, that the volume of waste generated in Bringin Village reached 2,7 liters/people/day. This plan projects the age for TPS 3R is next 10 years, so the volume of waste generation in 2032 is 16,22 m^3/day and waste composition was obtained in Bringin Village by organic waste 63,08% and inorganic waste 36,94%. The waste management and producing plan in TPS 3R Bringin Village is organic waste processed into aerobic composting with open bin method, while plastic waste processed into plastic pellets, inorganik waste recovered. Amount of waste generation at TPS-3R Bringin Village is 2136,75 kg/day meanwhile, the residue transport to TPA Benowo is 994,20 kg/day. There are 7 areas namely dropping area, waste sortir area, composting area, compos storage area, plastic waste management area, inorganic waste management area and residue area. and for the residue directly transported into TPA Benowo. The land required area for TPS 3R Bringin Village is 769,41 m^2 and budget plan for this construction of TPS 3R are Rp 1.446.962.000,00.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorMirwan, MohamadNIDN 0718077605UNSPECIFIED
Subjects: T Technology > TD Environmental technology. Sanitary engineering
Divisions: Faculty of Engineering > Departement of Environmental Engineering
Depositing User: Dian Retno Hapsari
Date Deposited: 15 Nov 2022 04:52
Last Modified: 15 Nov 2022 04:52
URI: http://repository.upnjatim.ac.id/id/eprint/10221

Actions (login required)

View Item View Item