Afriandi, Faisal (2023) Improvement BDI Factory Yogyakarta Menggunakan Metode Lean Manufacturing. Project Report (Praktek Kerja Lapang). UPN Veteran Jawa Timur.
|
Text (COVER)
19032010072-cover.pdf Download (396kB) | Preview |
|
|
Text (BAB I)
19032010072-bab1.pdf Download (74kB) | Preview |
|
|
Text (BAB II)
19032010072-bab2.pdf Download (198kB) | Preview |
|
Text (BAB III)
19032010072-bab3.pdf Restricted to Repository staff only until 29 December 2025. Download (86kB) |
||
Text (BAB IV)
19032010072-bab4.pdf Restricted to Repository staff only until 29 December 2025. Download (8kB) |
||
|
Text (BAB V)
19032010072-bab5.pdf Download (6kB) | Preview |
|
Text (LAMPIRAN)
19032010072-lampiran.pdf Restricted to Repository staff only until 29 December 2025. Download (4MB) |
Item Type: | Monograph (Project Report (Praktek Kerja Lapang)) | ||||||||
---|---|---|---|---|---|---|---|---|---|
Contributors: |
|
||||||||
Subjects: | T Technology > TS Manufactures > TS 155-194 Production Management, Operations Management | ||||||||
Divisions: | Faculty of Engineering > Departement of Industrial Engineering | ||||||||
Depositing User: | Faisal Afriandi | ||||||||
Date Deposited: | 29 Dec 2023 02:23 | ||||||||
Last Modified: | 29 Dec 2023 02:23 | ||||||||
URI: | http://repository.upnjatim.ac.id/id/eprint/19180 |
Actions (login required)
View Item |