PERENCANAAN INSTALASI PENGOLAHAN LUMPUR TINJA (IPLT) KABUPATEN NGANJUK DENGAN MENGGUNAKAN SISTEM KOLAM

Rosydah, Elfida (2022) PERENCANAAN INSTALASI PENGOLAHAN LUMPUR TINJA (IPLT) KABUPATEN NGANJUK DENGAN MENGGUNAKAN SISTEM KOLAM. Undergraduate thesis, UPN "VETERAN" JAWA TIMUR.

[img]
Preview
Text (Cover)
18034010068.-cover.pdf

Download (1MB) | Preview
[img]
Preview
Text (BAB 1)
18034010068.-bab1.pdf

Download (277kB) | Preview
[img] Text (BAB 2)
18034010068.-bab2.pdf
Restricted to Registered users only until 11 November 2024.

Download (791kB)
[img] Text (BAB 3)
18034010068.-bab3.pdf
Restricted to Registered users only until 11 November 2024.

Download (690kB)
[img] Text (BAB 4)
18034010068.-bab4.pdf
Restricted to Registered users only until 11 November 2024.

Download (1MB)
[img]
Preview
Text (BAB 5)
18034010068.-bab5.pdf

Download (21kB) | Preview
[img]
Preview
Text (Daftar Pustaka)
18034010068.-daftarpustaka.pdf

Download (136kB) | Preview
[img] Text (Lampiran)
18034010068.-lampiran.pdf
Restricted to Registered users only until 11 November 2024.

Download (11MB)

Abstract

Nganjuk Regency is one of the regencies in East Java Province with a fairly high population of 1,103,491 people. The high population affects the rate of wastewater production in a Regency/City. The purpose of this study is to plan the installation of a sewage treatment plant (IPLT) and the services that will be applied to the IPLT. This research method uses the method of observation, data analysis, calculation of planning dimensions.. The result of this research is that the dimensions of the equalization tub processing building are 1.4 m long, 0.7 m wide, and 1.8 m high. The imhoff tank is 40 m long, 9.5 m wide, with a building height of 9.5 m. Anaerobic tub 33 m long, 11 m wide, with a building height of 4.5 m. The facultative aeration tank is 34.5 m long, 11.5 m wide, with a building height of 2.5 m. The maturation tub is 28.5 m long, 9.5 m wide, with a building height of 1.5 m. Sludge Drying Bed 32 m long, 8 m wide, with a building height of 1.2 m. The sludge is dried in the sludge drying bed unit. The service scheme is in the form of direct suctioning of transportation transportation patterns.

Item Type: Thesis (Undergraduate)
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorHidayah, Euis Nurul0723107701UNSPECIFIED
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: Faculty of Engineering > Departement of Environmental Engineering
Depositing User: Elfida Rosydah
Date Deposited: 14 Nov 2022 06:03
Last Modified: 14 Nov 2022 06:03
URI: http://repository.upnjatim.ac.id/id/eprint/10171

Actions (login required)

View Item View Item